Asbestos abatement technical specifications, 130 Cedar Street, July 2004

Machine-extracted title · confidence 100%

Technical specifications document prepared for asbestos abatement work at the 130 Cedar Street site.

NYC-WTC_000125579–000125652

Folder label: “130 CEDAR STREET

Page image
Scanned page image, NYC-WTC_000125596
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Abatement Technical Specifications For 130 Cedar Street, New York, NY used to maintain critical barriers shall not be removed until final air clearance has been achieved.

c) After completion of clean-up operations, the Contractor shall notify the asbestos safety control monitor that an inspection is required prior to air clearance testing to ensure that no visible asbestos remains. After air samples are found to have airborne fiber concentrations of less than 0.010 f/cc final area breakdown, encapsulation of abated surfaces and removal of critical barriers may begin, if results are found to be above the acceptance criteria, the clean-up shall be repeated until compliance is achieved. Only after acceptable levels are achieved may the critical barriers be removed. The inside of windows shall be washed. All repairs and refinishing shall be performed.

d) Notice for a final Inspection shall be made by the Owner(s) or Contractor to the asbestos air sampling technician. Upon satisfactory inspection application for the Certificate of Completion may be made.

5.0 Personnel Qualifications

5.1 All Contractor personnel involved with asbestos work must be trained and tested prior to any work, and shall be thoroughly familiar with the Contractor's standard operating procedure for the abatement work. All personnel shall undergo the specific medical examinations required by OSHA. The • superintendent and the foreman shall be thoroughly familiar with all applicable regulations and practices for asbestos work and shall have participated in at least two abatement projects of similar size and scope within the past two years. All personnel shall be In possession of valid respirator fit test paperwork.

Anyone without the above qualifications shall not be allowed to work during the abatement phase at any time.

Superintendent and supervisor qualifications shall consist of:

a. Training and knowledge of applicable regulations and expertise in safety and environmental protection as evidenced by the participation in successful completion of, and certification by a training course offered by a NYC-DEP and NYS-DOL approved Asbestos Supervisor's course.

b. Experience with abatement work as evidenced through participation in at least two asbestos abatement projects, similar in size and scope to this project.

c. Fluency In English and the languages spoken by all employees, or a designated interpreter for each language shall be available on each shift. A list of designated interpreters and their work schedules shall be provided for the Owner(s). is Prepared by JLC Environmental Consultants, Inc. Project No. 04-3271 Page 18

NYC-WTC 000125596

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000125596Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000127738 · Box DEP Box 52

Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.

Cited alongside this record in an Ask answer

Compare copies and versions →