NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 105 pages

Police Academy asbestos abatement specifications, DDC

Machine-extracted title · confidence 48%

Contract specs for abatement of asbestos-containing materials at Police Academy.

NYC-WTC_000416762–000416866
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Abatement

integrity.

2. Control entry and exit into the work enclosure.

3. Ensure that employees are adequately trained in the use of engineering controls, proper work practices, proper personal protective equipment and in decontamination procedures.

4. Insure that employees use proper engineering controls, proper work practices, proper personal protective equipment and proper decontamination procedures.

5. Competent person shall check for rips and tears in work suits, and ensure that they are mended immediately or replaced.

E. Ah’ monitoring responsibilities, as defined in OSHA regulation 1926.58, shall be performed by a representative of the testing laboratory retained by the Contractor.

F. Contractor shall submit to the City all credentials of the designated competent person and industrial hygiene laboratory representative for approval.

G. Air monitoring and inspection shah be conducted by the Contractor's competent person.

H. Continuous (daily or per shift) monitoring and inspection will include Work Area samples, personnel samples from the breathing zone of a worker to accurately determine the employees' 8-hour TWA (unless Type C respirators are used) and decontamination unit clean room samples.

/. Work Area samples and employee personnel samples shall be taken using pumps whose flow rates can be determined to an accuracy of +5-percent, at a minimum of two liters per minute. This must be demonstrated at the job site.

J. Sampling and analysis methods shall be per NIOSH 7400A.

K. Test Reports:

1. Promptly process and distribute one copy of the test results, to the Commissioner.

2. Prompt reports are necessary so that if required, modifications to work methods and/or practices may be implemented as soon as possible.

3. Contractor shall by facsimile, and notify the Commissioner with 24 hours of the results of each test, followed by written notification within three days. CAPITAL PROJECT NUMBER PO79201K 02081-39 100: CONTRACT DOCUMENTS REV. May 3,2000 - 39 -100% CONTRACT DOCUMENTS REV. 0: DATE

CITY_21MC100_006631288

NYC-WTC_000416800

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000416800Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Asbestos sampling chain of custody form

NYC-WTC_000233286

Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.

Similar indexed content

Asbestos, NY DOL reference

NYC-WTC_000441450

Asbestos standards reference page from NY Department of Labor materials.

Similar indexed content

Compare copies and versions →