Asbestos Abatement
Require them to be worn at all times during these activities. Thoroughly
clean and decontaminate goggles before removing them from the Work
Area.
H. Gloves: provide work gloves to all workers, of the type dictated by the
Work and OSHA Standards. Do not remove gloves from the Work Area.
Dispose of as asbestos-contaminated waste at the end of the work.
Gloves shall be work at all times, except during Work Area Preparation
activities that do not disturb ACM.
I. Reusable footwear, hard hats and eye protection devices shall be left in the
contaminated Equipment Room until the end of the Asbestos Abatement Work.
J. Disposable protective clothing shall be discarded and disposed of as asbestos
waste every time the wearer exits from the workspace to the outside through the
decontamination facility.
K. Respirators, disposable coveralls, headcovers and footcovers shall be provided by
Contractor for the Facilities Representative, Resident Engineer and any other
authorized representative who may inspect the Work Area. Provide two
respirators and six respirator filter changes per day.
1.17 AIR MONITORING - CONTRACTOR
A. Contractor shall employ a qualified industrial hygiene laboratory to analyze air
samples in accordance with OSHA Regulations, 1926.58 (Asbestos Standards for
Construction), and 1910.134 (Respirator Standard) and New York City
regulations. All costs for this work shall be included in the Bid Price.
B. The industrial hygiene laboratory shall be a current proficient participant in the
American Industrial Hygiene Association (AIHA) PAT Program. The laboratory
identification number shall be submitted and approved by the City. The laboratory
shall be accredited by the AIHA and New York State department of Health
Environmental Laboratory Approval Program (ELAP).
C. Industrial hygiene laboratory shall also be a current proficient participant in
the NIST/NVLAP Quality Assurance Program for the identification of hulk
samples. Laboratory identification number shall be submitted to and approved
by the City.
D. Contractor shall require a competent person (as defined in OSHA 1926.58) to
perform the following functions and to be on-site continuously for the duration of
the project:
1. Monitor the set up of the Work Area enclosure and ensure its
CAPITAL PROJECT NUMBER PO79201K 02081-38
100: CONTRACT DOCUMENTS REV. May 3,2000
- 38 -100% CONTRACT DOCUMENTS
REV. 0: DATE
CITY_21MC100_006631287
NYC-WTC_000416799