Abatement specifications, exterior sealants, P.S. 92M

Machine-extracted title · confidence 45%

CoC/documents for asbestos-containing exterior sealant/caulking materials for DDC school task force, June 2001.

NYC-WTC_000455928–000456011
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

SECTION 02082

I. Contractor shall submit to the City all credentials of the designated competent person and industrial hygiene laboratory representative for approval.

J. Air monitoring and inspection shall be conducted by the Contractor's competent person.

K. Continuous (daily or per shift) monitoring and inspection will include Work Area samples, personnel samples from the breathing zone of a worker to accurately determine the employees' 8-hour TWA (unless Type C respirators are used) and decontamination unit clean room samples.

L. Work Area samples and employee personnel samples shall be taken using pumps whose flow rates can be determined to an accuracy of +5-percent, at a minimum of two liters per minute. This must be demonstrated at the job site.

M. Sampling and analysis methods shall be per NIOSH 7400A.

N. Test Reports:

1. Promptly process and distribute one copy of the test results, to the Commissioner.

2. Prompt reports are necessary so that if required, modifications to work methods and/or practices may be implemented as soon as possible.

3. Contractor shall by facsimiley-and notify the Commissioner with 24 hours of the results of each test, followed by written notification within three days.

4. Competent person shall conduct inspections and provide written reports daily. Inspections will include checking the standard operating procedures, engineering control systems, respiratory protection and decontamination systems, packaging and disposal of asbestos waste, and any other aspects of the project which may effect the health and safety of the people and environment.

O. All costs for required air monitoring by the Contractor's competent person shall be borne by Contractor.

P. The City reserves the right to conduct air and surface dust sampling in conjunction with and separate from the Testing Laboratory for the purposes of Quality Assurance.

Q. All samples shall be accompanied by a Chain of Custody Record that shall be submitted to the Resident Engineer upon completion of analysis.

1.28 WORK AREA CLEARANCE LEVELS "Clearance Air Monitoring" shall mean the employment of aggressive sampling techniques with a volume of air collected to determine the airborne concentration of residual fibers, and shall be performed as the final abatement activity.

A. Clearance and/or Reoccupancy Criteria:

02082-42

CITY_21 MCI 00_014563898

NYC-WTC_000455969

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000455969Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →