Revised WTC cleaning and monitoring scopes of work, June 2002

Machine-extracted title · confidence 75%

Distribution of revised scopes of work documents for WTC indoor cleaning and monitoring contracts.

NYC-WTC_000138626–000138658

Folder label: “E-Mails Hotline M. Gilsenan

Page image
Scanned page image, NYC-WTC_000138628
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

A third party Monitoring Contractor will perform air monitoring. Personal air monitoring will be performed on a minimum ofone worker per shift per apartment during the first 4-6 weeks ofcleaning operations. Thereafter, personal air samples will be taken randomly at a rate of one sample per quadrant per day. These results ofthis sampling shall be sent immediately to EPA, DEP, OSHA and the employer. The employer will make these results available to the employees or their designated representatives for their review in accordance with 29 CFR 1910.1001 and 29 CFR 1926.58.

C. Qualifications All work shall be performed by aNYS DOL licensed contractor with NYS DOLandNYC DEP certified workers. Proof of qualifications must be presented upon request.

D. Specifications This contract shall be in force for 18 consecutive months from the commencement date. Contractors must be prepared to mobilize within 72 hours of the contract award. Contractors shall have on staff and assigned to this contract a sufficient number ofproperly trained and certified workers to clean 20 units simultaneously and complete the clean up activities within each unit Wthm 2 days. Activities shall be coordinated with the proj ect monitor to ensure that the visual inspection is performed within two hours of the completion ofclean-up activities. Cleaning activities shall be considered completed upon successful visual inspection by the Project Monitor. Copies ofall invoices for work conducted under this contract shall be provided to USEPA and DEP.

The contractor shall prepare a Health arid Safety Plan (HASP) in with 29CFR1910.1020 and 29 CFR 1926.58. AU personnel involved in residential cloning activities shaU foUow the contractor HASP prepared by their employer. EPA shall be provided with acopy ofthe employer HASP prior to the start ofwork. AU cleanup operations will be conducted in accordance with either Scope A or Scope B as described below. ? A

HEPA means a filtersystem capable oftrapping and retaining 99.97% ofall mono-dispersed particles of 0.3 micrometers in diameter.

Scope of Work A Application: These procedures apply to the clean-up ofminimal dust accumulations (light coating). Ifa visual inspection indicates the presence of significant accumulations ofdust and/or debris from the collapse ofthe WTC Scope B procedures shall applied (refer to Scope ofWork B). Residents may be present during Scope A cleaiiing procedures.

I. Cleaning of Common Spaces Common spaces will be cleaned ifrequested by the building owner and determined necessary by EPA or designee.

Ifrequested and determined necessary by EPA, the cleanup contractor will initiate the cleanup by

NYC-WTC_000138628

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000138628Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →