Abatement specifications, exterior sealants, P.S. 92M

Machine-extracted title · confidence 45%

CoC/documents for asbestos-containing exterior sealant/caulking materials for DDC school task force, June 2001.

NYC-WTC_000455928–000456011
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

SECTION 02082 of dust, dirt, and debris. Evidence of asbestos contamination identified during the inspection will necessitate further cleaning as heretofore specified.

b) When the work area passes the Construction Manager visual reoccupancy inspection, air sampling shall not begin until at least one (1) hour after the area is dry from the wet cleaning. The testing laboratory shall perform air monitoring using aggressive testing techniques. Reoccupancy will be approved by the Construction Manager if the specified fiber count in the work area is achieved according to the testing laboratory.

c) A minimum of five PCM and five TEM air samples will be collected inside the work area to determine final air clearance reocupancy, provided that the amount of ACM is greater than 160 square feet or 260 linear feet. All PCM and TEM results must satisfy the clearance criteria for reoccupancy.

d) When volumes greater than or equal to 1,199 liters for a 25 mm filter and/or 2,799 liters for a 37 mm filter have been collected and all the TEM samples inside the abatement area is less than 70 s/mm^ of filter, the abatement work shall be considered complete without comparing the inside samples to the outside samples.

e) When the work area passes the reoccupancy test, all controls and seals established shall be removed.

B. Clearance Procedure for Areas Prepared Utilizing Tent Enclosure:

1. Clearance Procedure for Areas Prepared Utilizing Tent Enclosure:

a) Cleaning of the work areas and other contaminated areas shall be conducted in accordance with procedure described below:

Step 1. Clean-up Visual Inspection Step 2. Final Visual Inspection and fiber reoccupancy clearance count of <0.01 fiber/cc of air using NIOSH Method 7400 and less than 70 structures per mm^ when using Transmission Electron Microscopy.

b) Area air samples will be collected prior, during and after abatement according to established air clearance criteria per New York City Title 15.

c) To determine final air clearance reoccupancy, the following air samples shall be collected for each tent (provided that the amount of ACM is less than or equal to 160 square feet or 260 linear feet):

Five (5) PCM samples - inside work area Three (3) TEM samples - inside work area Three (3) PCM samples - outside work area Three (3) TEM samples - outside work area

02082-45

CITY_21 MCI 00_014563901

NYC-WTC_000455972

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000455972Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.