Police Academy asbestos abatement specifications, DDC

Machine-extracted title · confidence 48%

Contract specs for abatement of asbestos-containing materials at Police Academy.

NYC-WTC_000416762–000416866
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Abatement

C. Removal of ACM Utilizing Pull Containment Procedures shall be as follows:

1. Preparation Procedures:

a) Ensure that the Testing Laboratory has performed area monitoring and established a background count prior to the preparatory operations for each removal area, as applicable.

b) Shut down, isolate, and lock out or tag heating, ventilating, and air conditioning (HVAC) systems which serve or which pass through the Work Area. Vents within the Work Area and seams in HVAC components shall be sealed with tape and two layers of polyethylene sheeting. Eilters in HVAC systems shall be removed and treated as asbestos-contaminated waste.

c) Shut down, disconnect, and lock out or tag all electric power to the Work Area so that there is no possibility of its reactivation until after clearance testing of the Work Area.

d) Provide and install decontamination enclosure systems in accordance with Articles 3.01 and 3.02 of this Section.

e) Remove ACM that may disturbed by the erection of partitions using tent procedures and wet removal methods Removal shall be limited to a one-foot wide strip running the length/height of the partition.

f) Pre-clean and remove moveable objects from the Work Area. Pre­ cleaning shall be accomplished using HEPA-vacuum and wet­ cleaning techniques. Store moveable objects at a location determined by the City.

g) Protect carpeting that will remain in the Work Area.

(1) Pre-clean carpeting utilizing wet-cleaning techniques.

(2) Install a minimum of two layers of 6-mil reinforced polyethylene sheeting over carpeting.

(3) Place a rigid flooring material, minimum thickness of 3/8- inch, over polyethylene sheeting.

h) Pre-clean all fixed objects to remain within the Work Area using HEPA-vacuum and wet-cleaning techniques.

CAPITAL PROJECT NUMBER PO79201K 02081-72 100: CONTRACT DOCUMENTS REV. May 3,2000 - 72 -100% CONTRACT DOCUMENTS REV. 0: DATE

CITY_21MC100_006631321

NYC-WTC_000416833

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000416833Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Asbestos sampling chain of custody form

NYC-WTC_000233286

Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.

Similar indexed content

Asbestos, NY DOL reference

NYC-WTC_000441450

Asbestos standards reference page from NY Department of Labor materials.

Similar indexed content

Compare copies and versions →