Asbestos Abatement
i) Seal fixed objects with two individual layers, minimum, of 6-mil
polyethylene sheeting.
j) Pre-clean entire Work Area utilizing using HEPA-vacuum and wet
cleaning techniques. Methods of cleaning that raise dust, such as
dry sweeping or use of vacuum equipment not equipped with
HEPA-filters, is prohibited.
k) Install isolation barriers (i.e., sealing of all openings, including but
not limited to windows, corridors, doorways, skylights, ducts,
grills, diffusers, and other penetrations within the Work Area)
using two layers of 6-mil polyethylene sheeting and duct-tape.
1) Construct rigid framework to support Work Area barriers.
(1) Framework shall be constructed using 2-inch by 4-inch
wooden or metal studs placed 16 inch on center when
existing walls and/or ceiling do not exist for all openings
greater than 32 square feet. Framework is not required
except where one dimension is one foot or less or the
opening will be used as an emergency exit.
(2) Apply a solid construction material, minimum thickness of
3/8-inch to the Work Area side of the framing. In secure
interior areas, not subject to access from the public or
building occupants, an additional layer of 6-mil
polyethylene sheeting may be substituted for the rigid
construction material.
(3) Caulk all wall, floor, ceiling, and fixture joints to form a
leaktight seal.
m) Seal floor drains, sumps, shower tubs, and other collection devices
with two layers of 6-mil plastic and plywood, as necessary, and
provide a system to collect all water used by the Contractor.
Collected water shall be passed through a water filtration system
prior to being discharged into the sanitary sewer.
n) Remove ceiling mounted objects not previously sealed that will
interfere with removal operations. Mist object and surrounding
ACM with amended water prior to removal to minimize fiber
dispersal. Clean all moveable objects using HEPA-vacuum and
wet-cleaning techniques prior to removal from the Work Area.
o) Fiberglass insulation with intact coverings shall be protected in
place during abatement activities. These materials shall be
CAPITAL PROJECT NUMBER PO79201K 02081-73
100: CONTRACT DOCUMENTS REV. May 3,2000
- 73 -100% CONTRACT DOCUMENTS
REV. 0: DATE
CITY_21MC100_006631322
NYC-WTC_000416834
OCR can misread numbers and units. Confirm readings against the page image before using them.