NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 75 pages

RCNY Chapter 1 asbestos regulations, 1998

Machine-extracted title · confidence 38%

COSH-related NYC RO regulatory chapter on asbestos control.

NYC-WTC_000411802–000411876
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

CHAPTER 1—ASBESTOS CONTROL PROGRAM §1-81

(k) The isolation barriers (i.e., sealing off of all openings, including but not limited to windows, corridors, doorways, barriers, skylights, ducts, grills, diffusers, and any other penetrations of the work place) shall be installed with two layers of 6-mil plastic sheeting sealed with tape. All seams of HVAC or other system components that pass through the work place shall also be sealed. (1) The work area shall be segregated from the remainder of the work site by construction of temporary structural partitions as follows; (1) Partitions shall be constructed of conventional 2x3 (minimum) wood or metal stud framing, 16"CC maximum, to support barriers in all openings larger than 326;^, except where any one dimension is 1 foot or less, or where openings are exits covered in subdivision (p) below. (2) A solid construction material (e.g. plywood) of at least S/g" thickness shall be applied to the work side of the framing. In secure interior areas where partitions are not subject to access from the public, an additional layer of 6-mil plastic sheeting may be substituted for the solid construction material.

(3) The partitions shall be caulked/sealed at the floor, ceiling, walls, joints and fixtures to form an airtight seal. (m) In addition to the isolation barriers, floor and wall surfaces shall be sealed with a minimum of two layers of 6-mil plastic sheeting, except where the only ACM being abated in the project is vinyl asbestos floor tile, in which case the floor need not be sealed. The plastic layers on the floor shall extend 6 inches up the walls. Walls shall be covered with plastic sheeting down to the floor level, thus overlapping the floor material by a minimum of 6 inches. There shall be a distance of at least 6 inches between seams of adjacent layers. (n) After isolation barriers are in place, ceiling-mounted objects not pre­ viously sealed that w'"’^‘erfere with ACM abatement shall be rem^^ed and cleaned. Amended water spraying or HEPA-filtered vacuum equipment shall be used during fixture removal to reduce fiber dispersal. (o) Suspended ceiling tiles and T-grid components, contaminated by ACM, shall remain in place until the work area has been fully prepared as outlined in this section and electrical and HVAC systems have been shutdown. Suspended ceiling components shall be removed and disposed of as asbestos­ containing waste or retained for reuse after wet cleaning/HEPA vacuuming. (p) Emergency and fire exits from the work areas shall be maintained, or alternative exits shall be established in accordance with applicable NYC Code(s) and regulations. Exits shall be checked daily against exterior block­ age or impediments to exiting. (q) Entrances to the work place that will not be used for worker entry or -- emergency exits shall be locked to prevent unauthorized entry.

5823 RCNY 5-31-98

CITY_21MC100_006242977

NYC-WTC_000411846

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000411846Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Asbestos sampling chain of custody form

NYC-WTC_000233286

Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.

Similar indexed content

Compare copies and versions →