CHAPTER 1—ASBESTOS CONTROL PROGRAM §1-81
(k) The isolation barriers (i.e., sealing off of all openings, including but not
limited to windows, corridors, doorways, barriers, skylights, ducts, grills,
diffusers, and any other penetrations of the work place) shall be installed with
two layers of 6-mil plastic sheeting sealed with tape. All seams of HVAC or
other system components that pass through the work place shall also be
sealed.
(1) The work area shall be segregated from the remainder of the work site
by construction of temporary structural partitions as follows;
(1) Partitions shall be constructed of conventional 2x3 (minimum) wood
or metal stud framing, 16"CC maximum, to support barriers in all openings
larger than 326;^, except where any one dimension is 1 foot or less, or where
openings are exits covered in subdivision (p) below.
(2) A solid construction material (e.g. plywood) of at least S/g" thickness
shall be applied to the work side of the framing. In secure interior areas
where partitions are not subject to access from the public, an additional
layer of 6-mil plastic sheeting may be substituted for the solid construction
material.
(3) The partitions shall be caulked/sealed at the floor, ceiling, walls,
joints and fixtures to form an airtight seal.
(m) In addition to the isolation barriers, floor and wall surfaces shall be
sealed with a minimum of two layers of 6-mil plastic sheeting, except where
the only ACM being abated in the project is vinyl asbestos floor tile, in which
case the floor need not be sealed. The plastic layers on the floor shall extend
6 inches up the walls. Walls shall be covered with plastic sheeting down to
the floor level, thus overlapping the floor material by a minimum of 6 inches.
There shall be a distance of at least 6 inches between seams of adjacent layers.
(n) After isolation barriers are in place, ceiling-mounted objects not pre
viously sealed that w'"’^‘erfere with ACM abatement shall be rem^^ed and
cleaned. Amended water spraying or HEPA-filtered vacuum equipment shall
be used during fixture removal to reduce fiber dispersal.
(o) Suspended ceiling tiles and T-grid components, contaminated by ACM,
shall remain in place until the work area has been fully prepared as outlined
in this section and electrical and HVAC systems have been shutdown.
Suspended ceiling components shall be removed and disposed of as asbestos
containing waste or retained for reuse after wet cleaning/HEPA vacuuming.
(p) Emergency and fire exits from the work areas shall be maintained, or
alternative exits shall be established in accordance with applicable NYC
Code(s) and regulations. Exits shall be checked daily against exterior block
age or impediments to exiting.
(q) Entrances to the work place that will not be used for worker entry or
-- emergency exits shall be locked to prevent unauthorized entry.