NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 75 pages

RCNY Chapter 1 asbestos regulations, 1998

Machine-extracted title · confidence 38%

COSH-related NYC RO regulatory chapter on asbestos control.

NYC-WTC_000411802–000411876
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

§1-81 TITLE 15—DEPT. OF ENVIRONMENTAL PROTECTION (d) The worker decontamination enclosure system shall be installed or constructed priorto plasticizing the work area or before disturbing ACM. The waste decontamination enclosure system shall be installed or constructed prior to commencement of abatement. The area in which these systems are located shall require HVAC system isolation and plasticizing of electrical outlets and equipment that are within 6 inches of floor level. (e) (1) Prior to erection of partitions, ACM that may be disturbed during this activity shall be: (i) removed using a tent procedure (including engineering controls); and/or (ii) treated via wet methods. (2) Removal by the above procedures shall be limited to a maximum of a one foot wide strip running the length and/or height of the partition and is allowed only to facilitate erection of the partitions. (f) Heating, Ventilation and Air Conditioning (HVAC) System Isolation methods are listed below in order of preference; the more complex and potentially problematic methods may be used when the more preferred procedures are impractical. (1) Shut down and lock out HVAC systems and install isolation barriers (see §l-81(k)) to prevent contamination and fiber dispersal to other areas of the structure, or (2) isolate locally and provide temporary HVAC, or (3) positive pressurization of the HVAC system. This procedure shall be applied only under the direction and control of a professional engineer, or other knowledgeable licensed professional, after approval by the Depart­ ment. (g) Abatement shall not commence until work place preparation has been completed. (h) Movable objects within the proposed work areas shall be pre-cleaned (i.e., prior to commencing general abatement) using HEPA-filtered vacuum equipment and/or wet cleaning methods and such objects shall he removed from the work area. If carpeting is left in place, it shall be covered with 6-mil plastic sheeting, and then ^/g in. rigid flooring prior to normal plasticizing. (i) Fixed objects which will remain within the proposed work areas shall be pre-cleaned using HEPA filtered vacuum equipment and/or wet cleaning methods as appropriate, and enclosed with 6-mil plastic sheeting sealed to protect from re-contamination. (j) Priorto plasticizing, the proposed work areas shall be pre-cleaned using HEPA filtered vacuum equipment and/or wet cleaning methods. Methods that raise dust, such as sweeping or vacuuming with equipment not equipped with HEPA filters, are prohibited.

5822 RCNY 5-31-98

. T’ CITy_21MC100_006242976

NYC-WTC_OOO41 1845

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000411845Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Asbestos sampling chain of custody form

NYC-WTC_000233286

Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.

Similar indexed content

Compare copies and versions →