THE CONDITIONS
A personal decontamination enclosure systems that complies with Subpart 56 •9 shall
oe utilized. A waste decontamination enclosure system that fully complies with
Subpart 56-10 shall be utilized. These enclosure systems can be remote, on the
property and within 50 feet of the building, They shall not be removed until
satisfactory clearance air monitoring results have been achieved. The access area
oetween the work area and the remote decontamination unit shall be restricted using
tape barriers an warning signs.
2 !f remote decontamination units are to be used, workers shall don two (2) suits. anc
the containment shall have an attached air lock within which workers shall remove
trier outer suit, wipe off their inner suit and don a clean outer suit prior to proceering
to another work area or to the remote decontamination unit.
If remote decontamination units are to used, an airlock as defined in Subpart 56- '. = e:
of tnis Code Rule shall be constructed at the entrance to each asbestos work area
Large enough to serve as a changing area. This area shall not be used as waste
recontamination area {?r a waste storage,area.
dumpster areas shall cc
The building work areas, decontamination units, airlocks, and
cordoned off at a distance of twenty-five (25') and signed and shall remain vacatec
results have
except for certified workers until satisfactory clearance air monitoring
been achieved.
electrical circuits, machinery, and other electrical systems in the building must stay
r,, operation during the abatement the following conditions apply:
area snail
✓ All live conduits, cables and/or panel boxes that run through the work
polyethylene. Eacn
be covered with three layers of (6) six -mil fire retardant
layer shall be individually taped and sealed separately.
✓ Any energized circuits remaining in the work areas shall be posted with a (3;
ELECTRICAL
three inch high lettering warning sign which reads: DANGER LIVE
maximum
KEEP OUT. The sign shall be placed on all live covered barriers at a
of (10) ten-foot intervals. These signs shall be posted in
sufficient numbers tc
warn all persons authorized to enter the work area of the existence of the
energized circuits.
✓ All (3) three layers of polyethylene sheeting shall be left in place until
satisfactory clearance air monitoring results have been obtained.
✓ All electrical for the removal project shall be brought into the work area tn,rougn
a separate GFI panel box located outside the work area.