NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 02/44 WALL STREET Block: 43 Lot: 1
Document / 91 pages

Invoice for asbestos sample analysis, 44 Wall Street

Machine-extracted title · confidence 100%

Invoice detailing billing for bulk and air sample analysis results including PLM, PCM, and TEM testing at 44 Wall Street.

NYC-WTC_000094912–000095002

Folder label: “44 WALL STREET Block: 43 Lot: 1

Page image
Scanned page image, NYC-WTC_000094955
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

STATE OF NEW YORK - DEPARTMENT OF LABOR EMERGENCY NOTIFICATION REQUESTED DIVISION OF SAFETY AND HEALTH ASBESTOS CONTROL BUREAU a. Date of Request b. Time of Day State Office Campus Building 12- Room 454 c. Name of Person Granting Request AMENDED NOTIFICA Albany, N.Y. 12240 ❑ Postponed ❑ Cancelled New Start Date WITHIN TWO WORKING DAYS OF THE c New End Date EMERGENCY APPROVAL, you must submit Submitteb By ASBESTOS PROJECT NOTIFICATION duplicate copies of this form witn the appropriate fee to the Asbestos Contro .eier to Information Sheet or Bureau at the address shown. Rule 56 for Time Deadlines

NAME AND ADDRESS OF CONTRACTOR 2. FEDERAL EMPLOYER IDENTIFICATION NO. 3. ASBESTOS LICENSE NO P11 -.-.-.-.--Pii. . . . . DEGMOR, INC. different than listed in ITEM 1) 51 1 Canal Street - 3rd Floor Jew York, NY 10013 5. NAME AND ADDRESS OF PARTY FOR WHOM THE PROJECT IS BEING PERFORMED LANDLEASE REAL ESTATE '1 787 7th Avenue - New York, NY 10019 la NAME AND TITLE OF DULY AUTHORIZED REPRESENTATIVE b. TELEPHONE NO

Morris Napolitano (212) 431-0696 PROJECT INFORMATION PROVIDE ALL INFORMATION REQUESTED FOR THE BUILDING/SITE AT WHICH THE ASBESTOS PROJECT WILL BE CONDUCTED. • ADDRESS (INCLUDE NAME OF BUILDING.ROOM NO., CITY, TOWN, VILLAGE) 8. NAME OF BUILDING OWNER 14 Wall Street - New York, NY 10005 LANDLEASE REAL ESTATE

9 COUNTY 10. CURRENT USE OF BUILDING 11. AGE OF BUILDING 12. TOTAL CONTRACT AMOUNT "Manhattan Commercial 80 TBD 3 PROJECT DATE(S). List 14. TYPE OF ASBESTOS WORK (CHECK 15. WILL WORK ON THE PROJECT BE CONDUCTED UNDER A VARIANCE 7 If pnaseo project dates in ALL WHICH APPLY) yes, specify the type of variance: REMARKS (Item 28) CAPPLICABLE VARIANCE - NO.: AV- 11 9 ❑ Pipe Related a ACTUAL STARTING DATE ❑ Sprayed on Insulation 0 INDIVIDUAL VARIANCE - PETITION NO.: •j Roofing/Flashing 8 - 1 0-0 1 0 Vessel Covering ❑ Siding 16. WILL SUBCONTRACTORS BE USED ON THE PROJECT? ❑ NO ❑ 'r'ES PROJECTED ENDING DATE ❑ VAT 0 Demolition If yes, please list name and federal employer identification number of eac', ❑ Other (Specify) subcontractor in REMARKS (Item 28) on reverse of form 7-10-02

' 7 ASBESTOS PROCEDURE(S) TO BE USED 18. TYPE OF ASBESTOS 19. AMOUNT OF ASBESTOS INVOLVED - CHECK ALL APPLICABLE BOXES) (CHECK ALL WHICH APPLY) MATERIAL LINEAR FEET SQUARE FEET ❑ Less than 260 ❑ Less than 160 , x REMOvAL ❑ DEMOLITION (Specify) (Specify) FRIABLE ❑ ($100) 260-429 ❑ ($100) 160-259 ENCLOSURE ❑ DISTURBANCE 0 ❑ ($200) 430-824 ❑ ($200) 260-499 ENCAPSULATION HANDLING ❑ ($500) 500-999 0 ($500) 825-1649 OTHER(Specify) ❑ ($1000) 1650 OR MORE }x($1000) 1000 OR MORE NON-FRIABLE 10 non

(Specify) (Specify)

20 METHODS TO BE USED AT PROJECT SITE TO PREVENT ASBESTOS DISSEMINATION (INCLUDING TYPE OF EQUIPMENT AND VENTILATION SYSTEMS USED) POLY SHEETING, WATER RESISTANT DUCT TAPE & WOOD WILL BE USED FOR THE SET UP OF THE .NCLOSURES & DECONTAMINATION FACILITIES. DECONTAMINATION FACILITIES SHALL BE QUIPPED WITH SHOWERS AND WATER FILTRATION DEVICES. AIR FILTRATION DEVICES SHALL BE USED TO FILTER CONTAMINATED WATER. AMENDED WATER SHAT,T, RR TTSRT) TO wPT ArM I I verify that the information specified on this notification is true and accurate and that the project will be conducted in compliaQce with the rea;Iremer.ts of Code Rule 56

YUL (REP) 7-31-01 a for or Duly Authorized Representative a Signature of the Cont b. Date

PREPARETHIS APPLICATION IN TRIPLICATE AND SUBMIT: • An original and one copy (with an ink signature on both copies) to the New York State Department of Labor. Division of Safety and Healtr Asoes:.'s Control Bureau, State Office Campus, Building 12-Room 454, Albany, NY 12240; retain one copy for your records. • ; A certified check or money order, made payable to the Commissioner of Labor, for the fee due based on the project size as shown in item 9 This notification must be submitted at least 10 days prior to the starting date of the asbestos project.

NYC-WTC 000094955

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000094955Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000150335 · Box DEP Box 11

Review draft of an environmental health and safety plan for debris operations at Staten Island Landfill.

Cited alongside this record in an Ask answer

Compare copies and versions →