SECTION 02082
3.05 MAINTENANCE OF DECONTAMINATION ENCLOSURE FACILITIES AND BARRIERS
A. The following procedures shall be followed during the conduct of abatement activities.
1. All polyethylene barriers inside the work place and partitions constructed to isolate the
Work Area from occupied areas shall be inspected by the asbestos handler supervisor at
least twice per shift.
9 Smoke tubes shall be used to test the integrity of the Work Area barriers and the
decontamination enclosure systems daily before abatement activity begins and at the end
of each shift.
3. Damage and defects in the decontamination enclosure system shall be repaired
immediately upon discovery.
4. At any time during the abatement activity, if visible emissions are observed, or elevated
asbestos fiber counts outside the Work Area are measured, or if damage occurs to
barriers, abatement shall stop. The source of the contamination shall be located, the
integrity of the barriers shall be restored and extended to include the contaminated area,
and visible residue shall be cleaned up using appropriate HEPA-vacuuming and wet
cleaning.
5. Inspections and observations shall be documented in the daily project log by the asbestos
handler supervisor.
3.06 MODIFICATIONS TO HVAC SYSTEMS
A. Shut down, isolated or seal, all existing HVAC units, fans, exhaust fans, perimeter convection air
units, supply and/or return air ducts, etc., situated in, traversing or servicing the work zone.
B. Seal all seams with duct tap. Wrap entire duct with a minimum of two layers of 6-mil
polyethylene sheeting. All shutdowns are to be coordinated with the Facility. Where systems
must be maintained, i.e. traversing Work Areas to non-Work Areas, only supply ducts will be
maintained, protect as described above. All returns must be blanked off in Work Area and
adjacent areas, including floor above and below Work Area. When required Contractor shall
apply for a clarification from NYCDEP. The Contractor shall implement the following
engineering procedures:
1. Maintenance of a positive pressure within the HVAC system of 0.01 inch water gauge (or
greater) with respect to the ambient pressure outside the Work Area. The conditions for
this system shall be maintained and be operational 24 hours per day from the initiation of
Work Area preparation until successful final air clearance;
9 The positive pressurization of the duct shall be tested, inspected and recorded both at the
beginning and at the end of each shift;
3. The positive pressurization shall be monitored using instrumentation which will provide a
written record of pressurization and that will trigger an audible alarm, if the static
pressure falls below the set value;