NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 75 pages

RCNY Chapter 1 asbestos regulations, 1998

Machine-extracted title · confidence 38%

COSH-related NYC RO regulatory chapter on asbestos control.

NYC-WTC_000411802–000411876
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

§1-94 TITLE 15—DEPT. OF ENVIRONMENTAL PROTECTION (h) The recontainerized items of ACM and cleaned, bagged equipment shall be placed in open top, watertight plastic carts. These carts shall be held in the holding area pending removal. The carts shall be HEPA-vacuumed or wet-cleaned following the removal of the containers of ACM from them.

(i) The exit from the waste decontamination enclosure system shall be secured to prevent unauthorized entry.

(j) The carts shall be stored in a holding area of the work site.

§1-94 Maintenance of Decontamination Enclosure Systems and Barri­ ers. The following procedures shall be followed during the conduct of abate­ ment activities on large asbestos projects:

(a) All plastic barriers inside the work place and partitions constructed to isolate the work area from occupied areas shall be inspected by the asbestos handler supervisor at least twice per shift.

(b) Smoke tubes shall be used to test the integrity of the work area barriers and the decontamination enclosure systems daily at a minimum both before abatement activity begins and at the end of each shift. A visual inspection of idle barriers, including the use of differential manometers, shall be considered acceptable as a back-up test.

(c) Damage and defects in the decontamination enclosure system shall be repaired immediately.

(d) At any time during the abatement activity, if visible emissions are observed, or elevated asbestos fiber counts outside the work area are meas­ ured, or if damage occurs to barriers, abatement shall stop. The source of the contamination shall be located, the integrity of the barriers shall be restored, and visible residue shall be cleaned up using appropriate HEPA vacuuming and wet cleaning procedures immediately.

(e) Inspections, observations, and unusual incidents (e.g. barrier damage, contamination beyond the work area, etc.) shall be documented in the log by the asbestos handler supervisor.

5850 RCNY 5-31-98

. ^T-.. CITY_21MC1OO_OO6242991

NYC-WTC_000411860

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000411860Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Asbestos sampling chain of custody form

NYC-WTC_000233286

Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.

Similar indexed content

Compare copies and versions →