CHAPTER 1—ASBESTOS CONTROL PROGRAM §1-93
§1-93 Equipment and Waste Container Decontamination and Removal
Procedures. The following procedures shall be followed whenever equip
ment or containers are removed from the work area during a large asbestos
project.
(a) When the worker decontamination enclosure system shown in Illus
tration I alternates as a waste decontamination enclosure system, the clean
room shall be considered a holding area during the period of active waste
transfer only for the purpose of the loading of carts. Storage of waste and carts
in the clean room is prohibited.
(b) Where the waste decontamination enclosure system is part of the
worker decontamination enclosure system (see Illustrations II & IV), waste
removal shall not occur during worker shift changes or when workers are
showering or changing. Care shall be taken to prevent short circuiting and
cycling of air outward through the shower and clean room. .
(c) Where only one means of egress exists and the shower room is used as
a waste washroom, workers are to be stationed in each room/area of the
decontamination enclosure to transfer/process (see subdivisions (d), (h) and
(i) of this section) the containers and equipment to or from adjacent sections.
These workers are not to cross into the adjacent areas/rooms until the
waste/equipment transfer is finished for that period and the workers have
gone through decontamination as required by §1-92 of this chapter. The clean
room/holding area workers shall have entered from uncontaminated areas
with appropriate personal protective equipment; or prior to the start of waste
transfer, these workers shall have exited the work area, fully decontami
nated, and subsequently donned clean personal protective equipment.
(d) External surfaces of contaminated containers and equipment shall be
cleaned by wet cleaning and/or HEPA vacuuming in the work area before
transferring suchitems into the decontamination enclosure system. Contami
nated WA.divers shall not enter the washroom during this procedure.
(e) The cleaned containers of ACM and equipment shall be placed in
uncontaminated leak-tight plastic bags or sheeting as the item’s physical
characteristics demand. Air volume shall be minimized and the bags or
sheeting shall be sealed. Items that may puncture or tear the plastic bags or
sheeting shall be placed in a hardwali container and sealed.
(f) The clean recontainerized items shall be moved into the airlock for
subsequent transfer to the holding area. The washroom workers shall not
enter this airlock or the work area until waste removal is finished for that
period.
(g) Recontainerized items and cleaned equipment shall be removed from
the airlock to the holding area by workers who have entered from uncontami
nated areas with appropriate personal protective equipment.
5849 RCNY 5-31-98