NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 75 pages

RCNY Chapter 1 asbestos regulations, 1998

Machine-extracted title · confidence 38%

COSH-related NYC RO regulatory chapter on asbestos control.

NYC-WTC_000411802–000411876
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Part 4 Abatement Procedures

§1-101 Applicability §1-102 ACM Disturbance, Handling and Removal Procedures §1-103 Encapsulation Procedures §1-104 Enclosure Procedures §1-105 Glovebag Procedures §1-106 Tent Procedures

§1-101 Applicability. The following §§1-102 through 1-106 inclusive shall apply to all abatement activities.

§1-102 ACM Disturbance, Handling and Removal Procedures. The fol­ lowing procedures shall be followed during the conduct of abatement activities: (a) Abatement of asbestos-containing materials shall be by wet methods. Diy removal of asbestos-containing materials is prohibited, unless EPA approval has been obtained. The EPA-approved alternate removal plan shall be submitted to the Department for approval a minimum of 15 days before work is scheduled to begin or begins. The plan shall explain and justify why ACM must be removed dry and how asbestos fibers will be controlled to prevent their relea':^, (b) When amended water is used, the ACM shall be sprayed with sufficient frequency and quantity for enhanced penetration. Sufficient time shall be allowed for penetration to occur prior to removal action or other disturbance taking place. Accumulation of standing or free water is prohibited. Fluffy finable materials shall be saturated. Non-hygroscopic materials, such as tremolite or amosite, shall be thoroughly wetted on all surfaces while work is being conducted. (c) When used, removal encapsulants that minimize fiber generation and enhance penetration, shall be applied per manufacturer’s specifications and in accordance with federal guidelines (see §1-103). (d) ACM on detachment from the substrate is to be bagged directly or dropped onto a flexible catch basin and promptly bagged. Excess air in the bag shall be minimized and the bag shall be sealed. Non-hygroscopic

5861 RCNY 5-31-98

CITY_21MC100_006242992

NYC-WTC_000411861

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000411861Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Asbestos sampling chain of custody form

NYC-WTC_000233286

Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.

Similar indexed content

Compare copies and versions →