NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 110 pages

Chain-of-custody for NY asbestos regulation, Part 56

Machine-extracted title · confidence 52%

Page 1 of a chain-of-custody form referencing NY CRR Part 56 and the NYC WTC records.

NYC-WTC_000438568–000438677
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

equipment operating as per the requirements of this Part. (2) Collection of New Samples. After recleaning is complete, clearance air sampling shall not commence until the appropriate waiting/settling or drying time requirement as per Section 56-9.2(f) has elapsed and no visible asbestos debris, pools of liquid, or condensation remain. New clearance air samples for Phase II C shall be collected in all unsatisfactory regulated abatement work areas. Samples shall be placed in the same positions as before, and the new samples analyzed for concentrations of airborne fibers. (3) Repeating Air Sampiing and Anaiysis. The requirements of this Subdivision shall be repeated until satisfactory clearance air sampling results have been achieved, for all non-exempt regulated abatement work areas throughout the entire work site. 56-9.3 Dismantling of Regulated Abatement Work Area.

(a) Coiiapsing and Containerizing of Tent Enclosures. Each tent enclosure and airlock shall not be dismantled until clearance air sampling has been performed and satisfactory results obtained. The plastic sheeting which formed the tent, airlock, and the contents thereof, shall be fully collapsed, starting from the top and working downward. The tent and contents shall be placed in at least a six (6) mil plastic bag or hardwall container, sealed airtight with duct tape and removed for disposal. The plastic sheeting shall be treated as contaminated material and properly disposed of as asbestos waste.

(b) Removal of Tools and Equipment. All remaining tools and equipment shall be removed from the regulated abatement work area after proper decontamination as per this Part.

(c) Removal of Remaining Barriers. Once the asbestos abatement contractor receives satisfactory clearance air sample results, or an acceptable visual inspection for an exempt regulated abatement work area, and all tools and equipment are removed, all remaining polyethylene, duct tape, expandable foam and other barrier materials shall be bagged, wrapped or containerized and labeled as asbestos waste. Temporary hardwall barriers must be dismantled and removed from the site. If any debris is observed behind barriers, it shall be removed and bagged/containerized followed by HEPA-vacuuming and wet­ cleaning of the surfaces that were hidden behind the barrier. All waste generated shall be removed to the holding area, lockable trailer or lockable hardtop dumpster as per Section 8.9 of this Part. The asbestos abatement contractor’s supervisor shall then conduct a final inspection of the regulated abatement work area to certify that the abatement work is complete and no debris remains. The results of the final inspection for each regulated abatement work area shall be noted in the asbestos abatement contractor supervisor’s daily project log.

(d) Removal of Decontamination Enclosure. After all other remaining isolation barriers, tools and equipment have been removed from the regulated abatement

12 NYCRR56 Subpart 9, Page 92

CITY_21MC100_003246584

NYC-WTC_000438659

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000438659Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Asbestos, NY DOL reference

NYC-WTC_000441450

Asbestos standards reference page from NY Department of Labor materials.

Similar indexed content

Asbestos sampling chain of custody form

NYC-WTC_000233286

Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.

Similar indexed content

Compare copies and versions →