NYC 9/11 Public Portal Document
SECTION 02082
4. The supply air fan and the supply air damper for the active positive-pressurized duct shall
be placed in the manual “on” positions to prevent shutdown by fail-safe mechanisms;
5. The return air fan and the return air dampers shall be shut down and locked-out;
6. All the seams of the HVAC dusts that pass through the Work Area shall be sealed;
7. The HVAC ducts that pass through the Work Area shall be covered with two (2) layers of
6-mil polyethylene sheeting, and all seams and edges of both layers shall be sealed
airtight;
8. The supply air fans, return air fans, and all dampers servicing the Work Area itself shall
be shut down and locked-out. All openings within the Work Area of supply and return air
ducts shall be sealed with 3/8-inch plywood and two layers of 6-mil polyethylene;
9. When abatement occurs during periods while the HVAC system is shut down so that an
alternative method of pressurization of the duct passing through the Work Area is used
(e.g., by low-pressure “blowers”, etc., directly coupled into the duct). Item #4 above shall
be deleted and shall be replaced by the requirement to set the dampers of the HVAC duct
in the manual closed positions, in order to effect pressurization.
C. Contractor to coordinate this item with the Facility and Resident Engineer at the commencement
of work.
D. Where present HVAC systems (ducts) service a area, and that air system cannot be shut down,
Contractor shall isolate and seal the ducts, both supply and return, at the boundary of that zone.
1. To isolate, cap, or seal a duct, the Contractor shall remove insulation from duct (if
necessary), then disconnect linkage to fold shut all fire dampers. Contractor shall seal all
edges and seams with caulk and duct-tape.
2. Contractor shall then cut existing duct and fold metal in and secure with approved
fasteners. Contractor shall caulk and duct-tape all seams and edges.
3. All ducts shall then be completely wrapped and sealed with duct-tape and three (3) layers
of reinforced polyethylene sheeting.
4. All ducts shall be restored to original working order at the end of the project.
E. Where present HVAC systems (ducts) service occupied areas (non-Work Areas), the Contractor
shall blank off the ducts.
1. To isolate or seal the return duct, the Contractor shall remove any insulation (if
necessary) from the duct. Then disconnect linkage to fold shut all fire dampers and insert
a fiberglass board within the duct. Contractor shall seal all edges and seams with caulk,
duct-tape and three (3) layers of reinforced polyethylene sheeting.
2. All isolation of return ducts and any other activity that requires removal of ceiling by the
Contractor shall be conducted under controls. Work is to be coordinated with the
Resident Engineer and the Facility and is described as follows:
02082-67
CITY_21 MCI 00_014563840
NYC-WTC_000454640
OCR can misread numbers and units. Confirm readings against the page image before using them.