Specifications for asbestos-containing exterior sealants and caulking materials abatement.
48 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗CoC/documents for asbestos-containing exterior sealant/caulking materials for DDC school task force, June 2001.
NYC-WTC_000455928–000456011OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
SECTION 02082 must be maintained, i.e. traversing Work Areas to non-Work Areas, only supply ducts will be maintained, protect as described above. All returns must be blanked off in Work Area and adjacent areas, including floor above and below Work Area. When required Contractor shall apply for a clarification from NYCDEP. The Contractor shall implement the following engineering procedures:
1. Maintenance of a positive pressure within the HVAC system of 0.01 inch water gauge (or greater) with respect to the ambient pressure outside the Work Area. The conditions for this system shall be maintained and be operational 24 hours per day from the initiation of Work Area preparation until successful final air clearance; 9 The positive pressurization of the duct shall be tested, inspected and recorded both at the beginning and at the end of each shift;
3. The positive pressurization shall be monitored using instrumentation which will provide a written record of pressurization and that will trigger an audible alarm, if the static pressure falls below the set value;
4. The supply air fan and the supply air damper for the active positive-pressurized duct shall be placed in the manual “on” positions to prevent shutdown by fail-safe mechanisms;
5. The return air fan and the return air dampers shall be shut down and locked-out;
6. All the seams of the HVAC dusts that pass through the Work Area shall be sealed;
7. The HVAC ducts that pass through the Work Area shall be covered with two (2) layers of 6-mil polyethylene sheeting, and all seams and edges of both layers shall be sealed airtight;
8. The supply air fans, return air fans, and all dampers servicing the Work Area itself shall be shut down and locked-out. All openings within the Work Area of supply and return air ducts shall be sealed with 3/8-inch plywood and two layers of 6-mil polyethylene;
9. When abatement occurs during periods while the HVAC system is shut down so that an alternative method of pressurization of the duct passing through the Work Area is used (e.g., by low-pressure “blowers”, etc., directly coupled into the duct). Item #4 above shall be deleted and shall be replaced by the requirement to set the dampers of the HVAC duct in the manual closed positions, in order to effect pressurization.
C. Contractor to coordinate this item with the Facility and Resident Engineer at the commencement of work.
D. Where present HVAC systems (ducts) service a area, and that air system cannot be shut down. Contractor shall isolate and seal the ducts, both supply and return, at the boundary of that zone.
1. To isolate, cap, or seal a duct, the Contractor shall remove insulation from duct (if necessary), then disconnect linkage to fold shut all fire dampers. Contractor shall seal all edges and seams with caulk and duct-tape. 9 Contractor shall then cut existing duct and fold metal in and secure with approved
02082-67
CITY_21 MCI 00_014563923
NYC-WTC_000455994
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000454574
Specifications for asbestos-containing exterior sealants and caulking materials abatement.
48 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000448332
DOL 12 NYCRR Part 56 reference and regulatory context for asbestos.
18 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000438568
Page 1 of a chain-of-custody form referencing NY CRR Part 56 and the NYC WTC records.
18 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000453278
Chain-of-custody for asbestos-related samples under Part 56 rules in NYC WTC context.
18 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000450663
City asbestos regulatory document referencing NYS Part 56; file with NYC-WTC code tag.
18 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000443384
State regulation reference: Part 56 of Title 12 NYCRR, asbestos compliance document.
18 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000448811
New York City Part 56 asbestos documentation, NYC-WTC.
18 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000446470
State Part 56 asbestos chain-of-custody/document referencing NY Department of Labor; NYC files.
18 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000437549
Asbestos chain-of-custody record for NYC WTC project, including state code reference.
18 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000233286
Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.
18 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000451646
Asbestos Part 56 inspection reference document, NYC.
18 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000441450
Asbestos standards reference page from NY Department of Labor materials.
18 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000454574
Specifications for asbestos-containing exterior sealants and caulking materials abatement.
Similar indexed content
NYC-WTC_000448332
DOL 12 NYCRR Part 56 reference and regulatory context for asbestos.
Similar indexed content
NYC-WTC_000438568
Page 1 of a chain-of-custody form referencing NY CRR Part 56 and the NYC WTC records.
Similar indexed content
NYC-WTC_000453278
Chain-of-custody for asbestos-related samples under Part 56 rules in NYC WTC context.
Similar indexed content
NYC-WTC_000450663
City asbestos regulatory document referencing NYS Part 56; file with NYC-WTC code tag.
Similar indexed content