Abatement specifications, exterior sealants, P.S. 92M

Machine-extracted title · confidence 45%

CoC/documents for asbestos-containing exterior sealant/caulking materials for DDC school task force, June 2001.

NYC-WTC_000455928–000456011
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

SECTION 02082 fasteners. Contractor shall caulk and duct-tape all seams and edges.

3. All ducts shall then be completely wrapped and sealed with duct-tape and three (3) layers of reinforced polyethylene sheeting.

4. All ducts shall be restored to original working order at the end of the project.

E. Where present HVAC systems (ducts) seiwice occupied areas (non-Work Areas), the Contractor shall blank off the ducts.

1. To isolate or seal the return duct, the Contractor shall remove any insulation (if necessary) from the duct. Then disconnect linkage to fold shut all fire dampers and insert a fiberglass board within the duct. Contractor shall seal all edges and seams with caulk, duct-tape and three (3) layers of reinforced polyethylene sheeting.

2. All isolation of return ducts and any other activity that requires removal of ceiling by the Contractor shall be conducted under controls. Work is to be coordinated with the Resident Engineer and the Facility and is described as follows:

a) Work shall occur as scheduled.

b) Horizontal surfaces near the blanking operations shall be protected with 6-mil polyethylene sheeting.

c) Plastic drapes shall be used to enclose the immediate area.

d) Contractor to position and operate air filtration devices and HEPA-vacuums in the area to clean space after blanking operations.

e) All personnel involved with this work shall receive personal protection (i.e. respirators and disposable suits).

F. Upon loss of negative pressure or electric power, all work activities in an area shall cease immediately and shall not resume until negative pressure and/or electric power has been fully restored. When a power failure or loss of negative pressure lasts, or is expected to last, longer than thirty (30) minutes, the following sequence of events shall occur.

1. All make up air inlets shall be sealed airtight.

2. All decontamination facilities shall be sealed airtight after evacuation of all personnel from the Work Area.

3. All adjacent areas shall be monitored for potential fiber release upon discovery of and subsequently throughout, power failure.

3.07 LOCKOUT OF HVAC SYSTEMS AND ELECTRIC POWER

A. Prior to the start of any prep work, the Contractor shall employ skilled tradesmen with limited asbestos licenses for the following work:

02082-68

CITY_21 MCI 00_014563924

NYC-WTC_000455995

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000455995Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →