Asbestos Abatement
E. Where present HVAC systems (ducts) service occupied areas (non-Work Areas),
the Contractor shall blank off the ducts.
1. To isolate or seal the return duct, the Contractor shall remove any
insulation (if necessary) from the duct. Then disconnect linkage to fold
shut all fire dampers and insert a fiberglass board within the duct.
Contractor shall seal all edges and seams with caulk, duct-tape and three
(3) layers of reinforced polyethylene sheeting.
2. All isolation of return ducts and any other activity that requires removal of
ceiling by the Contractor shall be conducted under controls. Work is to be
coordinated with the Resident Engineer and the Facility and is described
as follows:
a) Work shall occur as scheduled.
b) Horizontal surfaces near the blanking operations shall be protected
with 6-mil polyethylene sheeting.
c) Plastic drapes shall be used to enclose the immediate area.
d) Contractor to position and operate air filtration devices and HEPA-
vacuums in the area to clean space after blanking operations.
e) All personnel involved with this work shall receive personal
protection (i.e. respirators and disposable suits).
F. Upon loss of negative pressure or electric power, all work activities in an area
shall cease immediately and shall not resume until negative pressure and/or
electric power has been fully restored. When a power failure or loss of negative
pressure lasts, or is expected to last, longer than thirty (30) minutes, the following
sequence of events shall occur.
1. All make up air inlets shall be sealed airtight.
All decontamination facilities shall be sealed airtight after evacuation of
all personnel from the Work Area.
3. All adjacent areas shall be monitored for potential fiber release upon
discovery of and subsequently throughout, power failure.
3.7 LOCKOUT OF HVAC SYSTEMS AND ELECTRIC POWER
A. Prior to the start of any prep work, the Contractor shall employ skilled tradesmen
with limited asbestos licenses for the following work:
1. Disable all ventilating systems or other systems bringing air into, or
CAPITAL PROJECT NUMBER PO79201K 02081-63
100: CONTRACT DOCUMENTS REV. May 3,2000
- 63 -100% CONTRACT DOCUMENTS