NYC-WTC_000104853
Facsimile cover sheet transmitting documents regarding environmental work at 102 Greenwich Street.
9 shared non-person entities · 1 shared topics · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
(2) This exemption does not relieve the asbestos abatement contractor from the negative pressure equipment requirements on other portions of the same project that require the use of negative pressure equipment. 56-7.9 Heating, Ventilation, and Air Conditioning (HVAC) Systems (a) Isolation. HVAC systems shall be isolated from the regulated abatement work area. Acceptable means of HVAC system isolation include: (1) Shutdown and Isolation. Shutdown and isolation of HVAC systems to prevent contamination and asbestos dispersal to other areas of the building or structure. (2) Local Isolation. Local isolation and provision for temporary HVAC. (3) Positive Pressurization. Positive pressurization of the HVAC system. (i) Positive pressurization shall be restricted to circumstances where HVAC must service the remainder of the building or structure and the HVAC equipment is in the regulated abatement work area or the ducts run through the regulated abatement work area. The appropriate HVAC duct and plenum outlets, inlets and exhaust dampers shall be sealed with caulking and a minimum 3/8-inch thickness plywood, or oriented strand board, or sufficient gauge sheet metal, covered with a double layer of at least six (6) mil fire- retardant plastic sheeting and duct taped airtight. The HVAC duct and plenum joints shall be duct taped airtight. The mixing and balancing damper positions shall be altered and the return fan(s) shall be shut down to produce the required positive pressures. (ii) Project phasing, climate conditions, load conditions and HVAC equipment limitations and controls shall be considered when this alternate procedure is evaluated. Aerodynamics in the duct system, particularly spurs or trunks, shall be considered and, if necessary, the ducts or dampers shall be altered or removed to prevent loss of positive pressure in any part of the system. Precautions shall be taken during abatement activities to insure that the ducts, seals and static pressure lines are not damaged. (iii) The presence of positive pressure shall be demonstrated daily by testing, including days when no Phase II work or support activities are scheduled, and the results must be noted in the asbestos abatement contractor supervisor’s daily project log. Air sampling in occupied, downstream, non-work areas shall be performed on a daily basis as per the requirements of Section 56-7.1 (b)(1) of this Subpart, except days when there are no Phase HA, I IB, or I IC activities. Positive pressure verification shall be done on a continuous basis. The differential pressure shall be easily verifiable by use of a leak free, rigid static pressure taps, static lines on the supply and return ducts and static lines originating in the regulated
12 NYCRR56 Subpart?, Page 64
CITY_21MC100_003235084
NYC-WTC_000233350
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000104853
Facsimile cover sheet transmitting documents regarding environmental work at 102 Greenwich Street.
9 shared non-person entities · 1 shared topics · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000128550
Asbestos inspection report notification form submitted to NYC DEP for 102-104 Greenwich Street.
11 shared non-person entities · 1 shared topics · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000154680
Application form submitted to the Department of Environmental Protection for notification of an asbestos inspection project.
7 shared non-person entities · 1 shared topics · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000125579
Technical specifications document prepared for asbestos abatement work at the 130 Cedar Street site.
15 shared non-person entities · similarity 0.974
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000127792
NYC DEP Asbestos Project Notification form for abatement activities at a facility in the Phase 1 Decontamination Plan binder.
6 shared non-person entities · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000102605
Scope of work document dated February 2003 detailing a mandatory pre-bid meeting and requirements for asbestos abatement contractor cleaning at 114 Liberty Street.
7 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000102620
Scope of work document dated February 2003 detailing a mandatory pre-bid meeting and requirements for asbestos abatement contractor cleaning at 114 Liberty Street.
7 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000112116
NYC DEP emergency notification form documenting an urgent asbestos abatement situation at 250 Vesey Place requiring immediate action.
10 shared non-person entities · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000100690
Permit application for a licensed asbestos contractor to clean interior dust at the unoccupied 114 Liberty Street building.
7 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗7 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗7 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155394
Transmission of cleanup and environmental monitoring documentation for 114 Liberty post-WTC dust remediation project.
7 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000125579
Technical specifications document prepared for asbestos abatement work at the 130 Cedar Street site.
Similarity score 0.947 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000097177
Permit application requesting licensed asbestos contractors to clean debris and dust from the interior of 125 Cedar Street.
Similarity score 0.943 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140443
Draft contract scope outlining compliance requirements and a direct assistance program for residents south of Canal Street.
Similarity score 0.943 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000163328
Distribution to environmental organizations, legal advocates, health agencies, unions, and academic institutions.
Similarity score 0.940 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000125579
Technical specifications document prepared for asbestos abatement work at the 130 Cedar Street site.
Similarity score 0.939 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140603
Contract establishing requirements for third-party asbestos monitoring and air sampling in residential buildings.
Similarity score 0.938 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Facsimile cover sheet transmitting documents regarding environmental work at 102 Greenwich Street.
Similar indexed content
NYC-WTC_000128550
Asbestos inspection report notification form submitted to NYC DEP for 102-104 Greenwich Street.
Similar indexed content
NYC-WTC_000154680
Application form submitted to the Department of Environmental Protection for notification of an asbestos inspection project.
Similar indexed content
NYC-WTC_000125579
Technical specifications document prepared for asbestos abatement work at the 130 Cedar Street site.
Similar indexed content
NYC DEP Asbestos Project Notification form for abatement activities at a facility in the Phase 1 Decontamination Plan binder.
Similar indexed content