4. The supply air fan and the supply air damper for the active positive-
pressurized duct shall be placed in the manual "on" positions to prevent
shutdown by fail-safe mechanisms;
5. The return air fan and the return air dampers shall be shut down and
locked-out;
6. All the seams of the HVAC dusts that pass through the Work Area shall
be sealed;
1. The HVAC ducts that pass through the Work Area shall be covered with
two (2) layers of 6-mil polyethylene sheeting, and all seams and edges of
both layers shall be sealed airtight;
8. The supply air fans, return air fans, and all dampers servicing the Work
Area itself shall be shut down and locked-out. All openings within the
Work Area of supply and return air ducts shall be sealed with 3/8-inch
plywood and two layers of 6-mil polyethylene;
9. When abatement occurs during periods while the HVAC system is shut
down so that an alternative method of pressurization of the duct passing
through the Work Area is used (e.g., by low-pressure "blowers", etc.,
directly coupled into the duct). Item #4 above shall be deleted and shall be
replaced by the requirement to set the dampers of the HVAC duct in the
manual closed positions, in order to effect pressurization.
C. Contractor to coordinate this item with the Facility and Resident Engineer at the
commencement of work.
D. Where present HVAC systems (ducts) service a area, and that air system cannot
be shut down, Contractor shall isolate and seal the ducts, both supply and return,
at the boundary of that zone.
1. To isolate, cap, or seal a duct, the Contractor shall remove insulation from
duct (if necessary), then disconnect linkage to fold shut all fire dampers.
Contractor shall seal all edges and seams with caulk and duct-tape.
2. Contractor shall then cut existing duct and fold metal in and secure with
approved fasteners. Contractor shall caulk and duct-tape all seams and
edges.
3. All ducts shall then be completely wrapped and sealed with duct-tape and
three (3) layers of reinforced polyethylene sheeting.
4. All ducts shall be restored to original working order at the end of the
project.
CAPITAL PROJECT NUMBER PO79201K 02081-62
100: CONTRACT DOCUMENTS REV. May 3,2000
- 62 -100% CONTRACT DOCUMENTS
REV. 0: DATE
CITY_21MC100_006631311
NYC-WTC_000416823
OCR can misread numbers and units. Confirm readings against the page image before using them.