Police Academy asbestos abatement specifications, DDC

Machine-extracted title · confidence 48%

Contract specs for abatement of asbestos-containing materials at Police Academy.

NYC-WTC_000416762–000416866
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Abatement

exhausting air out of, the Work Area. Disable system by disconnecting wires removing circuit breakers, by lockable switch or other positive means to ensure against accidental re-starting of equipment.

2. Lockout power to the Work Area by switching off all breakers and removing them from panels or by switching and locking entire panel. Label panel with following notation: "DANGER CIRCUIT BEING WORKED ON". Give all keys to Facility.

3. Lock out power to circuits running through Work Area whenever possible by switching off and removing breakers from panel. If circuits must remain live, the Facility shall notify Contractor in order that he may secure a variance from NYCDEP. Protect all conduit and wires to remain and label all active circuits at intervals not to exceed 3 feet with tags having the following notation: "DANGER LIVE ELECTROCUTION HAZARD". Label all circuits in all locations including hidden locations that may be affected by the work in a similar manner.

Part 4 - PREPARATION OF WORK AREA AND REMOVAL PROCEDURES

4.01 REMOVAL OF ASBESTOS-CONTAINING MATERIAL

A. Contractor shall be responsible for the proper removal of ACM from the Work Area using standard industry techniques. The Testing Laboratory representative shall observe the Work.

1. General Requirements

a) Removal of ACM shall be performed using wet methods. Dry removal of ACM is prohibited.

b) Spray ACM with amended water with sufficient frequency and quantity to enhance penetration. Sufficient time shall be allowed for amended water to penetrate the material to the substrate prior to removal. All ACM shall thoroughly wetted all sides while work is being conducted.

c) Accumulation of standing water on the floor of the Work Area is prohibited.

d) Apply removal encapsulants, when used, in accordance with the manufacturer's recommendations and guidelines.

e) Containerize ACM immediately upon detachment from the CAPITAL PROJECT NUMBER PO79201K 02081-64 100: CONTRACT DOCUMENTS REV. May 3,2000 - 64 -100% CONTRACT DOCUMENTS REV. 0: DATE

CITY_21MC100_006631313

NYC-WTC_000416825

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000416825Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Asbestos sampling chain of custody form

NYC-WTC_000233286

Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.

Similar indexed content

Asbestos, NY DOL reference

NYC-WTC_000441450

Asbestos standards reference page from NY Department of Labor materials.

Similar indexed content

Compare copies and versions →