Asbestos abatement technical specifications, 130 Cedar Street, July 2004

Machine-extracted title · confidence 100%

Technical specifications document prepared for asbestos abatement work at the 130 Cedar Street site.

NYC-WTC_000125579–000125652

Folder label: “130 CEDAR STREET

Page image
Scanned page image, NYC-WTC_000125627
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Abatement Technical Specifications For 130 Cedar Street, New York, NY caulking is adequately wetted it shall be stripped using hand tools, with • the ACM caulking being directly bagged or dropped into a flexible catch basin and promptly bagged. The stripped joints shall be HEPA vacuumed and wet-wiped to remove any loose debris still in place. All exposed joints shall be coated with a transparent encapsulant.

11. Upon completion of the stripping in one location and before moving to the next, the surfaces of the immediate work area shall be rendered free of visible debris. Next, the plastic covering of the platform shall be carefully cleaned and secured at the next work area. New polyethylene shall be applied only as needed.

12. If visible emissions are noted or If the asbestos-in-air concentrations within the building exceed 0.01 f/cc or the measured background level all work shall stop. Abatement procedures shall be reevaluated. Work shall not resume until NYCDEP is notified.

8.6 Removal of Asbestos Containing Wall Plaster, Skimcoat Plaster on Columns, Pipe and Pipe Fittings Insulation, Interior Boller Lining, Perimeter Waterproofing Tar, Electrical Wire Insulation, Electrical Panel Board, Fire Door Insulation, Transite Panel, and Ceiling Skimcoat under Full Containment Procedures

The Contractor shall use work methods and equipment that will keep the fiber count during abatement operations inside the work area to less than 0.1 fibers/cc of air when tested by NIOSH Method 7400.

1. Removal of ACM using full containment procedures (large projects).

a. Prepare the area as described In these Specifications. Remove ACM while providing a continual mist of amended water or removal encapsulant leaving it intact. Spray asbestos materials with a fine mist of amended water or removal encapsulant, saturating materials to the substrate. Spray the asbestos material repeatedly during work process to maintain a wet condition and to minimize asbestos fiber dispersion.

b. Remove the saturated asbestos material in small sections. As it is removed, pack the material in sealable plastic bags that shall be placed in labeled drums for transport. Remove insulation materials carefully from equipment. Do not permit them to fall to the floor.

c. After completion of all stripping work, surfaces from which ACM have been removed shall be wet brushed and sponged or cleaned by some equivalent method to remove all visible residue. (Do not use wire brushes.)

d. After the ACM removal and bagging, the bagged waste shall be HEPA-vacuumed then wet cleaned and transferred into the shower room for double bagging. The goose-neck and double-

Prepared by JLC Environmental Consultants, Inc. Project No. 04-3271 Page 49

NYC-WTC 000125627

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000125627Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000127738 · Box DEP Box 52

Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.

Cited alongside this record in an Ask answer

Compare copies and versions →