NYC 9/11 Public Portal Document
Asbestos Abatement Technical Specifications
For 130 Cedar Street, New York, NY
caulking is adequately wetted it shall be stripped using hand tools, with
• the ACM caulking being directly bagged or dropped into a flexible catch
basin and promptly bagged. The stripped joints shall be HEPA vacuumed
and wet-wiped to remove any loose debris still in place. All exposed joints
shall be coated with a transparent encapsulant.
11. Upon completion of the stripping in one location and before moving to the
next, the surfaces of the immediate work area shall be rendered free of
visible debris. Next, the plastic covering of the platform shall be carefully
cleaned and secured at the next work area. New polyethylene shall be
applied only as needed.
12. If visible emissions are noted or If the asbestos-in-air concentrations within
the building exceed 0.01 f/cc or the measured background level all work
shall stop. Abatement procedures shall be reevaluated. Work shall not
resume until NYCDEP is notified.
8.6 Removal of Asbestos Containing Wall Plaster, Skimcoat Plaster on Columns,
Pipe and Pipe Fittings Insulation, Interior Boller Lining, Perimeter
Waterproofing Tar, Electrical Wire Insulation, Electrical Panel Board, Fire Door
Insulation, Transite Panel, and Ceiling Skimcoat under Full Containment
Procedures
The Contractor shall use work methods and equipment that will keep the fiber
count during abatement operations inside the work area to less than 0.1
fibers/cc of air when tested by NIOSH Method 7400.
1. Removal of ACM using full containment procedures (large projects).
a. Prepare the area as described In these Specifications.
Remove ACM while providing a continual mist of amended
water or removal encapsulant leaving it intact. Spray asbestos
materials with a fine mist of amended water or removal
encapsulant, saturating materials to the substrate. Spray the
asbestos material repeatedly during work process to maintain a
wet condition and to minimize asbestos fiber dispersion.
b. Remove the saturated asbestos material in small sections. As
it is removed, pack the material in sealable plastic bags that
shall be placed in labeled drums for transport. Remove
insulation materials carefully from equipment. Do not permit
them to fall to the floor.
c. After completion of all stripping work, surfaces from which
ACM have been removed shall be wet brushed and sponged or
cleaned by some equivalent method to remove all visible
residue. (Do not use wire brushes.)
d. After the ACM removal and bagging, the bagged waste shall
be HEPA-vacuumed then wet cleaned and transferred into the
shower room for double bagging. The goose-neck and double-
Prepared by JLC Environmental Consultants, Inc. Project No. 04-3271 Page 49
NYC-WTC 000125627
OCR can misread numbers and units. Confirm readings against the page image before using them.