NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 75 pages

RCNY Chapter 1 asbestos regulations, 1998

Machine-extracted title · confidence 38%

COSH-related NYC RO regulatory chapter on asbestos control.

NYC-WTC_000411802–000411876
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Part 2 WbrA Place Preparation

§1-81 General Work Place Preparation Requirements §1-82 Worker Decontamination Enclosure System §1-83 Waste Decontamination Enclosure System

§1-81 General Work Place Preparation Requirements. The following procedures shall be followed during the conduct of abatement activities on large asbestos projects;

(a) The building owner or designated representative shall provide notifi­ cation to all occupants of the work place and immediate adjacent areas of the asbestos project. Information provided in the notification shall include con­ tractor, project location and size, amount and type of ACM, abatement procedure, dates of expected occurrence and the NYC-DEP telephone num­ ber. Postings of this notification shall be in English and Spanish, at eye level, in a conspicuous, well-lit place, at the entrances to the work place and immediate adjacent areas. The notice shall have the following heading; NOTICE OF ASBESTOS ABATEMENT, in a minimum of one inch sans serif, gothic or block style lettering, with the balance of the lettering of the notice to be of the same type lettering in a minimum of one quarter inch size. The notices shall be posted 7 calendar days prior to the start of the project and shall remain posted until clearance air monitoring is satisfactorily concluded. A lessee initiating an asbestos project shall give 10 calendar days notice to the owner of the subject building.

(b) The work place shall be vacated by the occupants prior to work place preparation and until successful clearance air monitoring.

(c) Electric power to all work areas shall be shut down and locked out except for electrical equipment that must remain in service. Safe temporary power and lighting shall be provided in accordance with all applicable codes. All power to work areas shall be brought in from outside the area through ground-fault interrupter at the source. Stationary electrical equipment with­ in the work area, which must remain' in service shall be adequately enclosed and ventilated.

5821 RCNY 5-31-98

CITY_21MC100_006242975

NYC-WTC_000411844

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000411844Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Asbestos sampling chain of custody form

NYC-WTC_000233286

Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.

Similar indexed content

Compare copies and versions →