NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 110 pages

NYC DEP chain-of-custody, Part 56

Machine-extracted title · confidence 60%

DOL 12 NYCRR Part 56 reference and regulatory context for asbestos.

NYC-WTC_000448332–000448441
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

56-7.11 Regulated Abatement Work Area Enclosure. (a) Criticai Barriers. Critical barriers shall be constructed to seal off all openings and penetrations to the regulated abatement work area including, but not limited to, operable windows and skylights, doorways and corridors (which shall not be used for passage), ducts, grills, diffusers, HVAC system seams, and any other penetrations to surfaces within the regulated abatement work area. Critical barriers shall be constructed using two (2) independent layers of at least six (6) mil fire-retardant plastic sheeting with each layer sealed separately with duct tape. Caulk and fire-retardant expandable foam may be used to seal small openings or penetrations. Doorways and corridors, which shall not be used for passage during the asbestos project, shall also be sealed. (b) Isolation Barriers. Temporary hardwall barriers to complete the containment enclosure and establish the asbestos project regulated abatement work area shall be constructed using the following, framing, sheathing, sealing and plasticizing criteria: (1) Framing. Isolation barrier partitions shall be constructed of wood or metal framing in all openings larger than 32 square feet, except that where any one dimension is one foot or less, framing is not required. Existing walls or framing may be used to support isolation barrier partition framing and sheathing. (2) Sheathing. A plywood or oriented strand board (OSB) sheathing material of at least 3/8-inch thickness shall be fastened to the regulated abatement work area side of the barrier partition. (3) Seaiing of isoiation Barriers. The edges of the isolation barrier partition shall be sealed at the floor, ceiling, walls and fixtures using caulk, fire- retardant expandable foam or duct tape to form an airtight seal. The seams of the partition sheathing shall also be sealed airtight using these techniques. (4) Piasticizing isoiation Barriers. The regulated abatement work area side of the isolation barrier partition shall be covered with two (2) layers of, at a minimum, six (6) mil fire-retardant plastic sheeting with staggered joints and sealed airtight. (c) Removal of Mounted Objects. After critical barriers and isolation barriers are in place, mounted objects shall be removed and HEPA-vacuumed or wet wiped or both. Localized HEPA-filtered vacuum equipment shall be used during mounted object removal to reduce potential asbestos dispersal.

(d) Elevator Shutdown or Isolation. Elevators running through the regulated abatement work area shall be shut down except as noted in this Subdivision:

(1) Isolation Detail. In projects where the elevator cannot be shut down, the hoistway door frames shall be enclosed with nominal 2” x 4” framing, 16 inch on center, covered with 3/8-inch thickness plywood or OSB sheathing, and caulked or duct taped airtight at all seams. The enclosures

12 NYCRR56 Subparty, Page 67

CITY_21MC100_003234516

NYC-WTC_000448398

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000448398Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Asbestos, NY DOL reference

NYC-WTC_000441450

Asbestos standards reference page from NY Department of Labor materials.

Similar indexed content

Asbestos sampling chain of custody form

NYC-WTC_000233286

Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.

Similar indexed content

Compare copies and versions →