NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 75 pages

RCNY Chapter 1 asbestos regulations, 1998

Machine-extracted title · confidence 38%

COSH-related NYC RO regulatory chapter on asbestos control.

NYC-WTC_000411802–000411876
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

§1-82 TITLE 15—DEPT. OF ENVIRONMENTAL PROTECTION

(r) Floor drains shall be sealed individually with two layers of 6-mil plastic sheeting and tape, and then covered as all other floor surfaces. Pits, sumps, etc., shall be covered with adequate plywood sheeting and secured to floor . slabs in a manner which prevents a tripping hazard, prior to required plasticizing.

(s) Elevators running through the work area shall conform to the follow­ ing; —

(1) The elevator door, in the work area shall be enclosed with conven­ tional 2x4 stud framing, covered with plywood sheeting and sealed at all edges and seams. The barrier shall be covered and lapped for 8 inches with two layers of 6-mil plastic sheeting adhered individually with edges taped for air tightness.

(2) Elevators not remaining in service shall have the fuses removed and the power switch locked in the open position.

(3) Elevators that remain in operation shall conform to the following additional procedures to minimize the piston effect that results:

(i) Elevator control shall be modified to bypass the work area.

(ii) A final larger layer of 6-mil plastic sheeting is to be taped airtight but with slack forming a larger perimeter diaphragm. Air leakage across the barrier shall be corrected upon discovery, and the elevator shaft shall be checked for airborne asbestos contamination.

(iii) This system shall be smoke tested daily.

(4) Elevator shafts shall not be used as waste chutes.

(t) Adequate toilet facilities shall be provided in the vicinity of the clean room external to the work place. Where such facilities do not exist, portable service shall be provided.

§1-82 Worker Decontamination Enclosure System. The following proce­ dures shall be followed during the conduct of abatement activities on large asbestos projects:

(a) Worker decontamination enclosure systems shall be located outside the work area and attached to all locations where workers will enter or exit the work area. One system at a single location for each contained work area is preferred. These systems may consist of existing rooms outside of the work area, that offer direct access to the work area and general egress from the work place. When this situation does not exist, enclosure systems may be constructed or may consist of prefabricated or trailer units. Adequate heat and light shall be safely provided.

5824 RCNY 5-31-98

CITY_21MC100_006242978

NYC-WTC_OOO41 1847

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000411847Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Asbestos sampling chain of custody form

NYC-WTC_000233286

Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.

Similar indexed content

Compare copies and versions →