NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 113 pages

Asbestos chain-of-custody, NYC WTC project, 2006

Machine-extracted title · confidence 50%

Asbestos chain-of-custody record for NYC WTC project, including state code reference.

NYC-WTC_000437549–000437661
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

(i) The elevator door in the regulated abatement work area shall be enclosed per Section 56-7.11 (d). (ii) Elevators not remaining in use shall have the fuses removed and the power switch locked in the open position. (iii) Elevator shafts shall not be used as waste chutes for asbestos waste material. (iv) Elevators that remain in use shall conform to the additional procedures to minimize the piston effects. (a) Elevator controls shall be modified to bypass the regulated abatement work area. (b) A third (final) layer of polyethylene is to be duct taped airtight but with slack so as to form a larger perimeter diaphragm. Air leakage across the barrier shall be corrected upon discovery, and the elevator shaft shall be checked for airborne asbestos contamination. If contamination is found in this area, the entire affected area shall be wet-cleaned prior to continuing any other work. (c) This system shall be smoke tested daily. (c) Removal. Removal of ACM, PACM and asbestos material shall proceed as per the requirements of Subpart 56-8. (d) Final Cleaning and Clearance Procedures. Final clean-up and clearance procedures for pre-demolition abatement shall comply with Section 56-9, except that only two (2) stages of cleaning (first and final) are to performed. Lockdown encapsulant use shall be consistent with Section 9.1 (b). (e) Final Waste Removal From the Site. The requirements of Subpart 56-10 shall apply, once all asbestos project regulated abatement work areas have been completed. 56-11.5 Controlled Demolition with Asbestos in Place.

(a) Air Sampling and Analysis. Air sampling and analysis on an asbestos project conducted under this Section shall be conducted in accordance with the requirements of Subpart 56-4 of this Part. (1) In addition to the requirement of Subpart 56-4.9(b-c), air monitoring within the work areas shall be conducted daily during abatement and cleaning activities. If more than one (1) shift daily is required to accomplish the work, air monitoring within the work area during abatement shall be performed on each shift, preferably at mid-shift timing. (b) Asbestos to Remain During Demolition. A building/structure may be demolished with asbestos material in place, as per the requirements of this Section, when the following condition is met:

12 NYCRR56 Subpart 11, Page 102

CITY_21MC100_012001727

NYC-WTC_000437651

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000437651Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000446470

State Part 56 asbestos chain-of-custody/document referencing NY Department of Labor; NYC files.

Similar indexed content

NYC-WTC_000448811

New York City Part 56 asbestos documentation, NYC-WTC.

Similar indexed content

Asbestos, NY DOL reference

NYC-WTC_000441450

Asbestos standards reference page from NY Department of Labor materials.

Similar indexed content

Compare copies and versions →