NYC-WTC_000125070
Contractor requirements and site plan notes for demolition work at 30 Cedar Street.
1 shared non-person entities · Same agency, volume and box · similarity 0.943
machine-extracted · confidence unavailable · Check page ↗Protocol document outlining air sampling and monitoring procedures for 130 Cedar Street.
NYC-WTC_000125098–000125202Folder label: “130 CEDAR STREET”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
130 Cedar Street July 15,2004 Selective Demolition and Facade Restoration Koenen Associates
2.11 TEMPORARY STAIRS. LADDERS. RAMPS. AND RUNWAYS
A. Provide and maintain all equipment such as temporary stairs, ladders, ramps, runways, and chutes as required for the proper execution of the work.
B. All such apparatus, equipment, and construction shall meet all requirements of the Labor Law and other state or local laws applicable thereto.
C. As soon as permanent stairs are erected, provide temporary protective treads, handrails, and shaft protection.
2.12 TEMPORARY TOILETS
A. Provide and maintain In a sanitary condition enclosed weathertight toilets for the use of all construction personnel at a location within the contract limits, complete with fixtures, water, and sewer connections and all appurtenances. Contractor at his option may leave one existing toilet functional for use of workmen. Upon completion of the work, toilets and their appurtenances shall be removed. Installation shall be In accordance with all applicable codes and regulations of authorities having jurisdiction. Chemical toilets will be permitted. The number of toilet rooms required shall be In accordance with the ANSI Standard Safety Code for Building Construction or other local authorities.
2.13 TEMPORARY WATER SERVICE
A. Contractor may use existing water service; meter water lines and pay for all water consumed.
2.14 SECURITY
A. Provide sufficient watchman service to prevent illegal entry or, damage during nights, holidays, or other periods when work Is not being executed, and such other control watchmen as required during working hours.
B. Provide all temporary enclosures required for protecting the project from the exterior, for providing passageways, for the protection of openings both exterior and Interior, and any other location where temporary enclosures and protection may be required.
C. Take adequate precautions against fire; keep flammable material at an absolute minimum; and ensure that such material is properly handled and stored. Except as otherwise provided herein, do not permit fires to be built or open salamanders to be used in any part of the work.
2.15 SNOW CONTROL
A. Remove snow and ice as necessary for the protection and prosecution of the work, and protect the work against weather damage.
2.16 ENVIRONMENTAL CONT
A. The Contractor shall comply with all applicable Federal, State and local laws, regulations, ordinances, codes and standards concerning environment control. Particular attention shall be given, without limitations, to:
1. Minimization of dust, containment of chemical vapors, control of exhaust gases, and control of smoke from temporary heaters.
Construction Facilities and Temporary Controls 01500-5
NYC-WTC 000125134
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000125070
Contractor requirements and site plan notes for demolition work at 30 Cedar Street.
1 shared non-person entities · Same agency, volume and box · similarity 0.943
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164903
Forwarded programmatic agreement documentation addressing post-disaster building cleaning procedures and eligible building list for recovery efforts.
7 shared non-person entities · 1 shared topics · similarity 0.952
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000093788
Fax transmittal from the Mayor's Office regarding a March 2002 meeting with the building group.
8 shared non-person entities · similarity 0.948
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000150931
Cover fax from the Mayor's Office forwarding DEP documents regarding exterior clean-up to be reviewed before a meeting with building owners.
7 shared non-person entities · similarity 0.946
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165271
Engineering drawings and specifications for replacing a high-pressure water line under the Lincoln Tunnel contract.
1 shared non-person entities · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000098577
Contract specifications outlining site decontamination and asbestos disposal procedures for 53 Park Place.
13 shared non-person entities · 1 shared topics · similarity 0.936
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000112207
Letter submitting a signed permit application for exterior cleaning at 14 Wall Street to the NYC DEP.
8 shared non-person entities · similarity 0.935
machine-extracted · confidence unavailable · Check page ↗8 shared non-person entities · similarity 0.935
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000115561
Attorney letter regarding legal proceedings between environmental protection authorities and property owners at 29 Park Row.
8 shared non-person entities · similarity 0.934
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000098612
Contract specifications outlining site decontamination and asbestos disposal procedures for 110 Church Street.
13 shared non-person entities · similarity 0.934
machine-extracted · confidence unavailable · Check page ↗8 shared non-person entities · similarity 0.934
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000113500
Legal agreement between NYC DEP and the building owner authorizing city-funded removal of foreign material.
8 shared non-person entities · similarity 0.933
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000155525
Initial draft of the comprehensive scope of work required to safely clean 114 Liberty Street following environmental damage.
Similarity score 0.956 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.956 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.956 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155460
Submission of a preliminary scope of work document for safely cleaning the 114 Liberty Street building.
Similarity score 0.956 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164903
Forwarded programmatic agreement documentation addressing post-disaster building cleaning procedures and eligible building list for recovery efforts.
Similarity score 0.954 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000093788
Fax transmittal from the Mayor's Office regarding a March 2002 meeting with the building group.
Similarity score 0.954 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000125204
Cover page for a survey report detailing asbestos and lead-based paint findings at 130 Cedar Street.
Cited alongside this record in an Ask answer
NYC-WTC_000125579
Technical specifications document prepared for asbestos abatement work at the 130 Cedar Street site.
Cited alongside this record in an Ask answer
NYC-WTC_000159285
Official letter confirming substantial completion of work under Contract REG-024D subject to outstanding punch list items.
Cited alongside this record in an Ask answer
NYC-WTC_000167029
Draft lease document outlining premises and terms for the Mayor's Office of Emergency Management at 7 World Trade Center.
Cited alongside this record in an Ask answer
Lease provision defining the landlord's ownership warranty and requirements for final layout and finish plans at 7 World Trade Center.
Cited alongside this record in an Ask answer