130 Cedar Street July 15,2004
Selective Demolition and Facade Restoration Koenen Associates
2.11 TEMPORARY STAIRS. LADDERS. RAMPS. AND RUNWAYS
A. Provide and maintain all equipment such as temporary stairs, ladders, ramps, runways,
and chutes as required for the proper execution of the work.
B. All such apparatus, equipment, and construction shall meet all requirements of the Labor
Law and other state or local laws applicable thereto.
C. As soon as permanent stairs are erected, provide temporary protective treads, handrails,
and shaft protection.
2.12 TEMPORARY TOILETS
A. Provide and maintain In a sanitary condition enclosed weathertight toilets for the use of
all construction personnel at a location within the contract limits, complete with fixtures,
water, and sewer connections and all appurtenances. Contractor at his option may leave
one existing toilet functional for use of workmen. Upon completion of the work, toilets and
their appurtenances shall be removed. Installation shall be In accordance with all
applicable codes and regulations of authorities having jurisdiction. Chemical toilets will be
permitted. The number of toilet rooms required shall be In accordance with the ANSI
Standard Safety Code for Building Construction or other local authorities.
2.13 TEMPORARY WATER SERVICE
A. Contractor may use existing water service; meter water lines and pay for all water
consumed.
2.14 SECURITY
A. Provide sufficient watchman service to prevent illegal entry or, damage during nights,
holidays, or other periods when work Is not being executed, and such other control
watchmen as required during working hours.
B. Provide all temporary enclosures required for protecting the project from the exterior, for
providing passageways, for the protection of openings both exterior and Interior, and any
other location where temporary enclosures and protection may be required.
C. Take adequate precautions against fire; keep flammable material at an absolute
minimum; and ensure that such material is properly handled and stored. Except as
otherwise provided herein, do not permit fires to be built or open salamanders to be used
in any part of the work.
2.15 SNOW CONTROL
A. Remove snow and ice as necessary for the protection and prosecution of the work, and
protect the work against weather damage.
2.16 ENVIRONMENTAL CONT
A. The Contractor shall comply with all applicable Federal, State and local laws,
regulations, ordinances, codes and standards concerning environment control.
Particular attention shall be given, without limitations, to:
1. Minimization of dust, containment of chemical vapors,
control of exhaust gases, and control of smoke from temporary
heaters.
Construction Facilities and Temporary Controls 01500-5