NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 50/130 CEDAR STREET
Document / 105 pages

Air sampling protocol document, 130 Cedar Street, Jan 2005

Machine-extracted title · confidence 100%

Protocol document outlining air sampling and monitoring procedures for 130 Cedar Street.

NYC-WTC_000125098–000125202

Folder label: “130 CEDAR STREET

Page image
Scanned page image, NYC-WTC_000125103
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Air Sampling and Monitoring Protocol Site: 130 Cedar Street Prepared for Masterworks Development and Service Contract. Emergency Air Monitoring at the World Trade Center Site. Ah 114 Liberty Street)

c) Continuous/During Samples:

Exterior mples will be collected for Particulates (as TSP's), Metals (as TSP's), , D/Fs, PCBs, Mercury (Hg), Silica (Si) and Asbestos. Real time particulate monitoring will be cndaeted"at the four exterior sampling locations for PM10 (particulate matter of less then 10 microns in size).

During work activities, ambient asbestos air sampling will be conducted for one (1) eight (8) hour period each day. These samples will be edy PCM with FREDof the total reanalyzed by TEM analysis___ __ Clearance Samples:

Interior samples , asbestos will be collected as per federal, state and local °" ~ regulations by with 5% of the total reanalyzed by TEM analysis. Silica ~.~J samples will be collected and analyzed from each work location. r ✓~ r'

nterio. ; pe samples for RCRA rtals, D/Fs, PCB f. Mercury (Hg), Silica (Si) A' will be collected (see background/am t sampq ection D, parts a

-& £)-Sampling and Monitoring ' £)-Sampling

1. Continuous Monitoring: The monitors selected to continuously measure PM10 during the exterior facade deconstruction work shall be beta-attenuation monitors • or an equivalent, acceptable method. Real time monitors are currently not an EPA reference method, one reference method PM1Q sampler will be co-located along side the real-time PM10 as a quality assurance (QA) check. This QA sampler will be rotated daily through all real-time PM10 monitoring locations for the duration of the sampling period.

2) Integrated Samplers: The monitors selected to measure TSP's, Metals and Silica shall be Federal Reference Method (FRM) samplers or an equivalent methodology. These are the samplers that are routinely used by USEPA and state agencies to measure compliance with ambient air quality standards. The TSP's are collected on an 8-inch x 10-inch micro quartz filter. The sampler flow rate is aenera_lly_set.a run at 40 actual cubic_feetper_minuteIacfmLand held at a constant flow rate by a volumetric flow orifice for the sample period. TSP filters will be analyzed using Inductively coupled plasto spectroscopy (ICP) fore eight RCRA metals.

3) Asbestos Sampling Units: Asbestos samples will be collected according to NIOSH 400using Phase Contrast Light sampling media is a t

NYC-WTC 000125103

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000125103Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →