Air sampling protocol document, 130 Cedar Street, Jan 2005

Machine-extracted title · confidence 100%

Protocol document outlining air sampling and monitoring procedures for 130 Cedar Street.

NYC-WTC_000125098–000125202

Folder label: “130 CEDAR STREET

Page image
Scanned page image, NYC-WTC_000125102
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Air Sampling and Monitoring Protocol Site: 130 Cedar Street Prepared for Masterworks Development 3) Northwest comer of the subject property at ground level

A total of one (1) exterior, perimeter location that is adjacent to the subject property will be selected on the downwind side of established prevailing winds at an elevated location. Masterworks Development will arrange access to this sampling location.

D) Sampling Phases

Sampling phases shall be broken down as follows: exterior background, interior background, continuous/during and clearance.

a) Exterior Background Samples: ambient/background sampling shall be conducted at exterior locations for one (1) sampling day consisting of, one (1) eight (8) hour sampling period. This sampling will be conducted prior to the commencement of 4econstructio activities.

Background samples will be collected at all four exterior sampling locations for the following types of compounds:

• Particulates as Total Suspended Particulates (TSPs) • etal as Total Suspend Particulates (TSPs) • As estos — PCM analysis ( o of total by TEM analysis) . ., , .-. c 1.' • Polycyclic Aromatic Hydrocarbons (PAHs) • Dioxins and Furans • PCBs • Mercury Silica

b) Interior Background Samples: interior Pambien/ t/background samples shall be conducted at various locations pn activities within the subject property. ,t t i --•.v'.•'.

Interior background sampling for asbestos shall be conducted as per federal, state and local regulations and as outlined in the JLC Asbestos Abatement , Technical Specification dated July 15, 2004, p. 59. Asbesto iai samples will be ' collected for analysis by PCM with o of the total number of samples reanalyzed utilizing TEM methodology. l .. (Interior d samples will also be collected for the following analytes: RC wipe samples for a allowing metals: aluminum (Al), arsenic, cadmium (Cd), copper (Cu), iron (Fe) manganese (Mrs), lead (Pb) and Zinc (Zn); Merry (1jg); SiI ~$1 , dioxins an~"rans; and PAHs. The wipe methodology Is outlined in the New York City Department of Environmental Protection Bureau of Environmental Compliance, WTC Unoccupied Building Cleaning Program Scope of Work, Project #WTC LBA (found in the contract document known as Supply

NYC-WTC 000125102

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000125102Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →