NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 44/LINCOLN TUNNEL W. 39TH STREET CONTRACT N. LT - 246 MANHATTAN
Document / 18 pages

Contract LT-246 plans for 39th Street water line replacement

Machine-extracted title · confidence 90%

Engineering drawings and specifications for replacing a high-pressure water line under the Lincoln Tunnel contract.

NYC-WTC_000165271–000165288

Folder label: “LINCOLN TUNNEL W. 39TH STREET CONTRACT N. LT - 246 MANHATTAN

Page image
Scanned page image, NYC-WTC_000165271
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

I

THE PORT AUTHORITY OF NEW YORK AND NEW JERSEY

H.T.L.

r LINCOLN TUNNEL

REPLACEMENT OF 39TH STREET HIGH PRESSURE WATER LINE

I

CONTRACT LT-246

I

o o CM 1

I CQ

PI^eL/MlNAfzy

/ NYC-WTC_000165271

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000165271Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000165268 · Box DEP Box 44

A cover sheet or index page for documents related to the West 39th Street contract involving the replacement of infrastructure.

Filed in the same folder

NYC-WTC_000165112 · Box DEP Box 44

Construction specifications document detailing foundation requirements for the World Trade Center river water intake system relocation project.

Similar indexed content

Compare copies and versions →