Asbestos Abatement
J. In addition, the Contractor is also responsible for preparing, amending and
submitting any Asbestos Variance Applications (ACP-9) that may be required
for the completion of the Contract or incidental work, (see Appendices).
K. The Contractor is also responsible for preparing and submitting all filings,
notifications, etc. required by all City, State and Federal regulatory agencies
having jurisdiction.
L. For coordination with other Contractors, see the General Conditions governing
all Contracts.
M. Related Asbestos Removal Work Under Other Contracts:
1. General Contractor shall be responsible for the removal of
incidental asbestos not identified in this section and found prior to
or during the Work.
2. Incidental asbestos is defined as ACM that is discovered during the
course of their work that must be abated to enable them to perform
the work of their Contract.
N. Work Hours:
1. The Contractor shall establish his work schedule in a way that
avoids interference or conflict with the normal functioning of the
facility. Work in the evenings shall be done at no additional cost to
the City.
2. All work shall be done during regular working hours unless
the Contractor requests authorization to work in other than regular
working hours and such authorization is granted by the
Commissioner. (Regular working hours are those during which any
given facility in which work is to be done is customarily open and
functioning.) If such work schedule is authorized by the
Commissioner the work shall be done at no additional cost to the
City.
3. The order of phases and start dates associated with each will be
determined by the Resident Engineer.
4. Contractor shall be required to schedule waste transfer during
evening hours, when activity within the facility is at a minimum.
Evening hours are defined as 6:00 p.m. to 6:00 a.m. Waste
transfer must be approved by the Resident Engineer and Facility
Manager.
O. The following conditions shall apply to all temporary shutdowns of existing
CAPITAL PROJECT NUMBER PO79201K 02081-7
100: CONTRACT DOCUMENTS REV. May 3,2000
- 7 -100% CONTRACT DOCUMENTS
REV. 0: DATE
CITY_21MC100_006631256
NYC-WTC_000416768