NYC-WTC_000454574
Specifications for asbestos-containing exterior sealants and caulking materials abatement.
48 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗CoC/documents for asbestos-containing exterior sealant/caulking materials for DDC school task force, June 2001.
NYC-WTC_000455928–000456011OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
SECTION 02082 method to be employed in order to control pollution, including but not limited to emergency procedures for fire and medical emergencies and for failure of seals. This plan must be approved by the Construction Manager prior to the start of any asbestos work.
It is the Contractor’s sole responsibility to plan and perform the work in such a manner that it is brought to successful completion. This includes Work Area preparation, removals and final cleaning to an acceptable standard.
B. The Abatement Contractor shall also develop a detailed plan of action to respond to the release of airborne asbestos fibers in the event of an emergency. This plan (which must be accepted by the Construction Manager, Resident Engineer and School Principal) is to include but not limited to; procedures to isolate and eliminate ACM, emergency evacuation procedures, telephone numbers of all relevant parties, air monitor, etc.
C. Prior to start of preparatory work as discussed, the Contractor shall attend a preconstruction conference and walk-through attended by Construction Manager and Testing Lab Environmental Control Representative (ECR).
Agenda for this conference will include but not necessarily be limited to:
1. Contractor’s scope of work, work plan and schedule
2. Contractor’s safety and health precautions including protective clothing and equipment and decontamination procedures.
3. Testing laboratory’s air monitoring plan.
4. Contractor’s work procedures including.
Methods of job site preparation and decontamination chamber set-up, biodegradable foam and procedures, and removal methods; respiratory procedures; procedures for decontaminating the objects in the removal work procedures sections, methods of handling removed material and disposal procedures; cleanup procedures and equipment; signs and labels; fire exists and emergency procedures.
5. Contractor’s plan for 24 hour job security both for prevention of theft and for barring entry of curious but unprotected personnel into Work Areas.
6. Temporary utilities.
7. Documentation of compliance with environmental laws and standards.
1.15 STANDARD OPERATING PROCEDURES
A. Develop and implement a written standard procedure for abatement work to ensure maximum protection and safeguard from asbestos exposure of the workers, the non work areas of the school, visitors, employees, public, and environment.
02082-22
CITY_21 MCI 00_014563878
NYC-WTC_000455949
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000454574
Specifications for asbestos-containing exterior sealants and caulking materials abatement.
48 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000448332
DOL 12 NYCRR Part 56 reference and regulatory context for asbestos.
18 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000438568
Page 1 of a chain-of-custody form referencing NY CRR Part 56 and the NYC WTC records.
18 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000453278
Chain-of-custody for asbestos-related samples under Part 56 rules in NYC WTC context.
18 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000450663
City asbestos regulatory document referencing NYS Part 56; file with NYC-WTC code tag.
18 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000443384
State regulation reference: Part 56 of Title 12 NYCRR, asbestos compliance document.
18 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000448811
New York City Part 56 asbestos documentation, NYC-WTC.
18 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000446470
State Part 56 asbestos chain-of-custody/document referencing NY Department of Labor; NYC files.
18 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000437549
Asbestos chain-of-custody record for NYC WTC project, including state code reference.
18 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000233286
Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.
18 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000451646
Asbestos Part 56 inspection reference document, NYC.
18 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000441450
Asbestos standards reference page from NY Department of Labor materials.
18 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000454574
Specifications for asbestos-containing exterior sealants and caulking materials abatement.
Similarity score 0.991 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000416762
Contract specs for abatement of asbestos-containing materials at Police Academy.
Similarity score 0.975 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000104853
Facsimile cover sheet transmitting documents regarding environmental work at 102 Greenwich Street.
Similarity score 0.974 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000128550
Asbestos inspection report notification form submitted to NYC DEP for 102-104 Greenwich Street.
Similarity score 0.973 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000125579
Technical specifications document prepared by JLC Environmental Consultants for asbestos abatement work at 130 Cedar Street.
Similarity score 0.968 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000125579
Technical specifications document prepared by JLC Environmental Consultants for asbestos abatement work at 130 Cedar Street.
Similarity score 0.968 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000454574
Specifications for asbestos-containing exterior sealants and caulking materials abatement.
Similar indexed content
NYC-WTC_000448332
DOL 12 NYCRR Part 56 reference and regulatory context for asbestos.
Similar indexed content
NYC-WTC_000438568
Page 1 of a chain-of-custody form referencing NY CRR Part 56 and the NYC WTC records.
Similar indexed content
NYC-WTC_000453278
Chain-of-custody for asbestos-related samples under Part 56 rules in NYC WTC context.
Similar indexed content
NYC-WTC_000450663
City asbestos regulatory document referencing NYS Part 56; file with NYC-WTC code tag.
Similar indexed content