Police Academy asbestos abatement specifications, DDC

Machine-extracted title · confidence 48%

Contract specs for abatement of asbestos-containing materials at Police Academy.

NYC-WTC_000416762–000416866
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Abatement

services.

1. All temporary lighting and temporary electrical services for use in the Work Area shall be in weather proof enclosures and be ground fault protected and:

a. Shall be performed at no additional charge to the City.

b. Shall be performed at times not interfering with the other activities in the building.

c. Shall be performed only with written consent from the Commissioner and the Facility Manager.

d. Shall be made through written request to the Commissioner at least 10 days in advance with complete written description of the work to be performed.

P. Stages of Asbestos Removal Work:

1. The Abatement Contractor will be required to perform the work and it is the intent of this Specification to remove all asbestos containing and asbestos contaminated materials from the Work Area. The Contractor is responsible for verifying all quantities of materials listed here and Bid accordingly.

Q. Certain equipment in the Work Area may need to remain operational during removal. Therefore, the removal of ACM from this equipment shall be performed as the last removal activities within the Work Area. The Contractor shall coordinate the scheduling for the removal of ACM on functioning equipment with the Resident Engineer.

13 SPECIAL EXPERIENCE REQUIREMENTS FOR ASBESTOS ABATEMENT

A. The following special experience requirements shall be submitted by Contractor performing asbestos abatement along with their bid application to ensure that the work in this Contract will be performed by persons knowledgeable, qualified and trained as specified herein.

1. The Contractor or Subcontractor performing the asbestos work specified within this Section must have been in the business of performing asbestos abatement work for a period of three years prior to the bid opening. During that three year period, the asbestos contractor must, as a prime contractor or a subcontractor, have CAPITAL PROJECT NUMBER PO79201K 02081-8 100: CONTRACT DOCUMENTS REV. May 3,2000 - 8 -100% CONTRACT DOCUMENTS REV. 0: DATE

CITY_21MC100_0 06631257

NYC-WTC_000416769

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000416769Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Asbestos sampling chain of custody form

NYC-WTC_000233286

Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.

Similar indexed content

Asbestos, NY DOL reference

NYC-WTC_000441450

Asbestos standards reference page from NY Department of Labor materials.

Similar indexed content

Compare copies and versions →