Police Academy asbestos abatement specifications, DDC

Machine-extracted title · confidence 48%

Contract specs for abatement of asbestos-containing materials at Police Academy.

NYC-WTC_000416762–000416866
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Abatement

Work Approximate Square Feet Approximate Linear Feet Area (Sq.Ft.) (LF) 1 50 Lf. Pipe and Pipe Fitting Insulation 2 1500 Sq. Ft. VAT and Mastic 3 20 Lf. Pipe and Pipe Fitting Insulation 4 1500 Sq.Ft. VAT and Mastic 5 1650 Sq. Ft. VAT and Mastic 6 960 sq. Ft. Slab

D. This facility is under the jurisdiction of the New York City Police Department. The Contractor shall perform the work of this contract in a manner that will be least disruptive to the normal use of the building.

E. Contractor's attention is directed to the fact that patents cover certain methods of asbestos abatement indicated in the specifications. To date, patents have been issued with regard to negative pressure enclosures or negative or reduced pressure and glove-bag.

F. Contractor shall be solely responsible for and shall hold the City of New York Department of Design and Construction and the City harmless from, any and all damages, losses and expenses resulting from any infringement by Contractor of any patent, including but not limited to the patents described above, used by Contractor during performance of this agreement.

G. Prior to starting, the General Contractor must notify the Commissioner of the City of New York Department of Design and Construction if he anticipates any difficulty in performing the work as directed and required by these Specifications. Contractor shall be required to attend an on-site job meeting with the Resident Engineer prior to start of work to examine conditions of the site for removal and plan the sequence for removal operations.

H. Contractor is responsible for amending the Asbestos Inspection Report (ACP-7) Form initially submitted by City to the Department of Buildings and resubmitting it to the NYCDEP Asbestos Control Program prior to abatement work as per Title 15, Chapter I ofRCNY.

I. If more than one year has elapsed since the original ACP-7 was submitted to the Department of Buildings, Contractor is responsible for preparing and submitting a new ACP-7 to the Department of Environmental Protection as well as providing all other notifications to various regulatory agencies as required.

CAPITAL PROJECT NUMBER PO79201K 02081-6 100: CONTRACT DOCUMENTS REV. May 3,2000 - 6 -100% CONTRACT DOCUMENTS REV. 0: DATE

CITY_21MC100_006631255

NYC-WTC_000416767

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000416767Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Asbestos sampling chain of custody form

NYC-WTC_000233286

Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.

Similar indexed content

Asbestos, NY DOL reference

NYC-WTC_000441450

Asbestos standards reference page from NY Department of Labor materials.

Similar indexed content

Compare copies and versions →