Asbestos Abatement
Work Approximate Square Feet Approximate Linear Feet
Area (Sq.Ft.) (LF)
1 50 Lf. Pipe and Pipe Fitting
Insulation
2 1500 Sq. Ft. VAT and Mastic
3 20 Lf. Pipe and Pipe Fitting
Insulation
4 1500 Sq.Ft. VAT and Mastic
5 1650 Sq. Ft. VAT and Mastic
6 960 sq. Ft. Slab
D. This facility is under the jurisdiction of the New York City Police
Department. The Contractor shall perform the work of this contract in a
manner that will be least disruptive to the normal use of the building.
E. Contractor's attention is directed to the fact that patents cover certain
methods of asbestos abatement indicated in the specifications. To date,
patents have been issued with regard to negative pressure enclosures or
negative or reduced pressure and glove-bag.
F. Contractor shall be solely responsible for and shall hold the City of New York
Department of Design and Construction and the City harmless from, any and
all damages, losses and expenses resulting from any infringement by
Contractor of any patent, including but not limited to the patents described
above, used by Contractor during performance of this agreement.
G. Prior to starting, the General Contractor must notify the Commissioner of the
City of New York Department of Design and Construction if he anticipates any
difficulty in performing the work as directed and required by these
Specifications. Contractor shall be required to attend an on-site job meeting
with the Resident Engineer prior to start of work to examine conditions of the
site for removal and plan the sequence for removal operations.
H. Contractor is responsible for amending the Asbestos Inspection Report (ACP-7)
Form initially submitted by City to the Department of Buildings and
resubmitting it to the NYCDEP Asbestos Control Program prior to abatement
work as per Title 15, Chapter I ofRCNY.
I. If more than one year has elapsed since the original ACP-7 was submitted to
the Department of Buildings, Contractor is responsible for preparing and
submitting a new ACP-7 to the Department of Environmental Protection as well
as providing all other notifications to various regulatory agencies as required.
CAPITAL PROJECT NUMBER PO79201K 02081-6
100: CONTRACT DOCUMENTS REV. May 3,2000
- 6 -100% CONTRACT DOCUMENTS
REV. 0: DATE
CITY_21MC100_006631255
NYC-WTC_000416767
OCR can misread numbers and units. Confirm readings against the page image before using them.