NYC 9/11 Public Portal Document
work areas. Eight (8) air changes shall be maintained for friable gross removal tent enclosure work areas. If a HEPA-filtered vacuum is used for a Minor size abatement tent enclosure work area to maintain the required air changes, after final cleaning is completed twenty (20) minutes shall elapse, then ventilation may be stopped, clearance air samples collected if required, and the tent sealed until results are read. If air sample results are unacceptable, ventilation shall be re-established, the area re-cleaned and new samples taken. (2) Fire-Retardant Spray Plastic. Fire-retardant spray plastic may be used in lieu of two (2) layers of six (6) mil plastic sheeting as required by 56- 7.11 (e), under the following conditions: (i) Critical barriers are installed per Section 56-7.11 (a) of this Part. (ii) The fire-retardant spray plastic is used, applied, maintained and removed in accordance with the manufacturer’s detailed procedures by persons who have been trained by the manufacturer or others authorized to perform such training. Proof of appropriate training shall be located at the work site and shall be produced upon verbal request of the Commissioner or his or her duly authorized representative. (iii) Application shall be made to result in a dry thickness of not less than six (6) mils. (3) Special Projects. See Subpart 56-11 regarding work area preparation requirements for special projects. These projects include exterior non- friable ACM roofing, siding, caulking, glazing compound, transite, tars, sealers, coatings, and other NOB ACM abatement, abandoned intact pipe/duct/conduit wrap and cut abatement, flooring and mastic abatement, pre-demolition abatement, demolition with asbestos in place, in-plant operations abatement, emergency project abatement and Minor size project abatement.
(4) Removal of Ceilings and Components. Suspended ceiling and components that exist below friable ACM or PACM material, and that are not themselves ACM or PACM, shall remain in place until the remainder of the regulated abatement work area has been plasticized, negative air established, and personal and waste decontamination enclosures have been constructed. The ceiling tiles and components shall then be removed and disposed of as asbestos waste or decontaminated if possible. This type of removal must be done prior to commencement of Phase II B abatement, but after the remaining regulated abatement work area preparation has been completed. Critical barriers shall be installed above the suspended ceiling as per Section 56-7.11(a), prior to the commencement of Phase I IB abatement.
(5) Exits. Emergency and fire exits from the regulated abatement work area
12 NYCRR56 Subparty, Page 70
CITY_21MC100_011986138
NYC-WTC_000453348
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000448332
DOL 12 NYCRR Part 56 reference and regulatory context for asbestos.
25 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000438568
Page 1 of a chain-of-custody form referencing NY CRR Part 56 and the NYC WTC records.
25 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000446470
State Part 56 asbestos chain-of-custody/document referencing NY Department of Labor; NYC files.
25 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000443384
State regulation reference: Part 56 of Title 12 NYCRR, asbestos compliance document.
25 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000450663
City asbestos regulatory document referencing NYS Part 56; file with NYC-WTC code tag.
25 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000448811
New York City Part 56 asbestos documentation, NYC-WTC.
25 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000441450
Asbestos standards reference page from NY Department of Labor materials.
25 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000451646
Asbestos Part 56 inspection reference document, NYC.
25 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000233286
Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.
25 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000437549
Asbestos chain-of-custody record for NYC WTC project, including state code reference.
25 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000411802
COSH-related NYC RO regulatory chapter on asbestos control.
17 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000454574
Specifications for asbestos-containing exterior sealants and caulking materials abatement.
17 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000448332
DOL 12 NYCRR Part 56 reference and regulatory context for asbestos.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000438568
Page 1 of a chain-of-custody form referencing NY CRR Part 56 and the NYC WTC records.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000443384
State regulation reference: Part 56 of Title 12 NYCRR, asbestos compliance document.
Similarity score 0.986 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000437549
Asbestos chain-of-custody record for NYC WTC project, including state code reference.
Similarity score 0.986 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000446470
State Part 56 asbestos chain-of-custody/document referencing NY Department of Labor; NYC files.
Similarity score 0.986 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000448811
New York City Part 56 asbestos documentation, NYC-WTC.
Similarity score 0.986 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000448332
DOL 12 NYCRR Part 56 reference and regulatory context for asbestos.
Similar indexed content
NYC-WTC_000438568
Page 1 of a chain-of-custody form referencing NY CRR Part 56 and the NYC WTC records.
Similar indexed content
NYC-WTC_000437549
Asbestos chain-of-custody record for NYC WTC project, including state code reference.
Similar indexed content
State Part 56 asbestos chain-of-custody/document referencing NY Department of Labor; NYC files.