NYC-WTC_000454574
Specifications for asbestos-containing exterior sealants and caulking materials abatement.
48 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗CoC/documents for asbestos-containing exterior sealant/caulking materials for DDC school task force, June 2001.
NYC-WTC_000455928–000456011OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
SECTION 02082 5. Provide all scaffolding, platform installation, equipment, tools, transportation and any other equipment required and/or necessary to complete all work described in the Contract Documents.
6. The Contractor shall be responsible for and shall include in its Bid any and all fees or changes imposed by Local, State or Federal Law, Rule or Regulation applicable to the work specified herein, including fees or charges which may be imposed subsequent to the date of the Bid opening.
7. Removal of ACSM shall be in accordance with large project full containment procedures as described in NYC DEP Title 15, Chapter 1, Subchapter F and Section 4,01 of these Specifications,
8. A variance for utilizing tent procedures, as described in Section §1-106 of Title 15, Chapter 1 and Section 4,02 of these Specifications, in lieu of large project full containment procedures as required above, within the Work Areas shall be applied for and approved by NYCDEP prior to the start of abatement activities. The following variances to Title 15, Chapter 1 shall be included within the variance request:
a. In lieu of hardwood barriers, the Work Area shall be enclosed with construction tarpaulin which will enclose the exterior of the entire scaffolding system; b. At street level Work Areas, a hardwood vision barrier shall be constructed. This vision barrier shall be installed to separate the Work Area(s) from the general public and shall be positioned to enclose and secure the Work Area(s) and area between the Work Area(s) and decontamination unit. These barriers shall be constructed of 4 foot by 8 foot plywood sheeting of minimum thickness of 3/8 inch. The plywood sheeting shall be fastened and supported by 2 inch by 4 inch wood or metal framing, 16 inch on center; c. Tent containments shall be utilized for all Work Areas, including those in which more than 160 square feet of material is being removed; d. Two layers of 6-mil polyethylene sheeting shall be used for tent construction and shall be erected within the framework of the scaffolding; e. Windows within the Work Area and within twenty-five feet of the Work Area shall be sealed with two layers of 6-mil polyethylene sheeting on both interior and exterior surfaces; f. During abatement air samples shall be collected and shall be analyzed as final clearance air samples. The results of these analyses will be used as clearance results for reoccupancy; g- The pre and post-abatement waiting/settling periods shall be waived and breakdown shall commence once final clearance air monitoring (during samples) results are determined to be satisfactory; and h. The air filtration devices (AFDs) shall be exhausted locally and the requirement of exhausting at least 40 feet from all openings, intakes, etc, shall be waived. All openings, intakes, etc, within twenty-five feet of the Work Area will be sealed with two layers of polyethylene sheeting. i. Air monitoring procedures shall be altered as follows:
02082-4
CITY_21 MCI 00_014563860
NYC-WTC_000455931
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000454574
Specifications for asbestos-containing exterior sealants and caulking materials abatement.
48 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000448332
DOL 12 NYCRR Part 56 reference and regulatory context for asbestos.
18 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000438568
Page 1 of a chain-of-custody form referencing NY CRR Part 56 and the NYC WTC records.
18 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000453278
Chain-of-custody for asbestos-related samples under Part 56 rules in NYC WTC context.
18 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000450663
City asbestos regulatory document referencing NYS Part 56; file with NYC-WTC code tag.
18 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000443384
State regulation reference: Part 56 of Title 12 NYCRR, asbestos compliance document.
18 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000448811
New York City Part 56 asbestos documentation, NYC-WTC.
18 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000446470
State Part 56 asbestos chain-of-custody/document referencing NY Department of Labor; NYC files.
18 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000437549
Asbestos chain-of-custody record for NYC WTC project, including state code reference.
18 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000233286
Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.
18 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000451646
Asbestos Part 56 inspection reference document, NYC.
18 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000441450
Asbestos standards reference page from NY Department of Labor materials.
18 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000454574
Specifications for asbestos-containing exterior sealants and caulking materials abatement.
Similarity score 0.966 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000127792
NYC DEP Asbestos Project Notification form for abatement activities at a facility in the Phase 1 Decontamination Plan binder.
Similarity score 0.957 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000125076
Fax transmission regarding updated asbestos project submittals and requested changes for the 130 Cedar Street permit application.
Similarity score 0.956 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134132
Environmental consultant work plan detailing asbestos abatement and demolition procedures for 133-135 Greenwich Street and 21-23 Thames Street.
Similarity score 0.956 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155460
Submission of a preliminary scope of work document for safely cleaning the 114 Liberty Street building.
Similarity score 0.956 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155525
Initial draft of the comprehensive scope of work required to safely clean 114 Liberty Street following environmental damage.
Similarity score 0.955 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000454574
Specifications for asbestos-containing exterior sealants and caulking materials abatement.
Similar indexed content
NYC-WTC_000448332
DOL 12 NYCRR Part 56 reference and regulatory context for asbestos.
Similar indexed content
NYC-WTC_000438568
Page 1 of a chain-of-custody form referencing NY CRR Part 56 and the NYC WTC records.
Similar indexed content
NYC-WTC_000453278
Chain-of-custody for asbestos-related samples under Part 56 rules in NYC WTC context.
Similar indexed content
NYC-WTC_000450663
City asbestos regulatory document referencing NYS Part 56; file with NYC-WTC code tag.
Similar indexed content