Preliminary scope of work document for cleaning 114 Liberty Street,

Machine-extracted title · confidence 95%

Initial draft of the comprehensive scope of work required to safely clean 114 Liberty Street following environmental damage.

NYC-WTC_000155525–000155603

Folder label: “114 LIBERTY 2 OF 2

Page image
Scanned page image, NYC-WTC_000155562
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

December 17,2002 114 LIBERTY STREET REMOVAL OF DUST, DEBRIS. AND CONTAMINATED MATERIALS

9. The Contractor shall isolate the Work Area for the duration of the work by completely and individually sealing off all openings, windows, skylights, etc. with two (2) layers of polyethylene sheeting.

10. The clean side of these barriers shall be monitored by Ambient Group, Inc. If at anytime airborne concentrations for any of the target metals exceed their respective exposure limits and/or airborne fiber concentrations are equal to or exceed 0.01 fibers/cc, the Contractor shall halt all operations and shall be required to completely clean all areas as directed by the Owner.

11. The contractor shall completely cover the floor of the Work Area with two (2) layers of reinforced polyethylene sheeting.

12. All polyethylene sheeting shall be securely attached to walls, floors, etc. with quality "duct tape", glue, and/or mechanical support.

13. The Contractor shall install a sufRcient number of negative air filtration units in the Work Area, as well as window mounted HEPA filtered manifold systems for make-up air, to provide both a minimum of four (4) air changes per hour and 0.02” wc negative pressure.

14. The removal operations will not begin until the Work Area has been inspected and approved by Ambient Group, Inc. A minimum differential pressure between the Work Area and adjacent occupied spaces shall be negative 0.02 inches water gauge. The contractor shall install a manometer by the personal decontamination chamber in order to verify and monitor the pressure differential.

END OF SECTION 07

34 © AMBIENT GROUP. INC. - 2002

TEMPORARY ENCLOSURES AND WORK AREA PREPARATION

NYC-WTC_000155562

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000155562Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →