Abatement specifications, exterior sealants, P.S. 92M

Machine-extracted title · confidence 45%

CoC/documents for asbestos-containing exterior sealant/caulking materials for DDC school task force, June 2001.

NYC-WTC_000455928–000456011
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

SECTION 02082

(1) During abatement air samples shall be analyzed as final clearance air samples. (2) During abatement air samples shall be collected in the following locations: (a) One side-by-side PCM and TEM air sample shall be collected in each classroom which is adjacent to a Work Area; (b) One PCM air sample shall be collected in each corridor which is adjacent to a Work Area; (c) One PCM air sample shall be collected within the clean room of each worker and waste decontamination unit; (d) One PCM air sample shall be collected within each airlock; and (e) One PCM air sample shall be collected within ten feet of the perimeter of each Work Area. (3) TEM air samples shall be analyzed when PCM air samples are aboye the clearance criteria of less then or equal to 0.01 fibers per cubic centimeter of air. (4) During abatement air sampling shall cease after final cleanup and satisfactory yisual inspection is receiyed by the Testing Laboratory. j- A remote worker and waste decontamination unit shall be utilized for tent containments and shall be constructed in accordance with NYC DEP Title 15, Chapter 1 §1-82 and §1-83. The remote decontamination units shall be within 100 feet of the Work Area for which they are being utilized. The area between the Work Area and remote decontamination units shall be cordoned off and access shall be restricted to abatement personnel.

Work Hours: Asbestos

The Contractor shall be aware that a summer program will be ongoing within the school July and August 2001. Removal of asbestos containing materials shall be performed after the program hours from 2:00 p.m. to 12:00 a.m. on program days or on Saturdays and, Sundays during non­ program hours. REMOVAL OF ASBESTOS CONTAINING MATERIALS DURING PROGRAM HOURS IS PROHIBITED.

Security-Contractor Employee Identification

The Contractor shall provide a photo identification badge for all his employees and in addition require that any and all sub-contractors provide the same for their employees.

Work Schedule

Any Contractor requesting and receiving permission to work in school buildings on Saturday, Sunday, Holidays and other than regular hours during school days are required to pay the Board of Education for the duly authorized extra seiwice, compensation in accordance with the following schedule:

1. After 5:00 pm on regular school days Monday through Friday — $26.00/hr.

02082-5

CITY_21 MCI 00_014563861

NYC-WTC_000455932

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000455932Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →