Contract specifications for decontamination, 53 Park Place, Nov 2001

Machine-extracted title · confidence 90%

Contract specifications outlining site decontamination and asbestos disposal procedures for 53 Park Place.

NYC-WTC_000098577–000098611

Folder label: “32 PARK PLACE Block: 126 Lot: 2 Soe 7 BIN: 1001410 110 Church Street, 50 Murray Street

Page image
Scanned page image, NYC-WTC_000098590
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

1

The proposals based upon these Specifications shall be held as made with full knowledge of conditions and requirements. Bidders are required to visit the premises prior to the time of submitting proposals for work herein described, and thoroughly inspect the conditions under which the contract is to be executed.

The Contractor shall provide all necessary water supply on each floor. All waste water from the I showers shall be prefiltered and disposed of in accordance with NYS DEC Requirements.

All hauling of asbestos waste shall be by a New York State licensed asbestos waste transfer facility.

Contractor agrees to defend and hold the Owner and Consultant harmless from any and all fines, levies or penalties including the cost to defend against any penalties issued by the New York State Department Of Labor, NYCDEP or any other jurisdictional authorities as a result of any actions or work procedures used by the Contractor or his Subcontractors or any persons employed by or assisting the Contractor or his Subcontractors.

I Bidders shall examine the site of proposed work and shall determine existing conditions that may affect the work.

I No consideration or allowance will be granted for any misunderstanding of work to be done or materials to be used.

I The Contractor shall provide the Consultant with a current Form MCS-90 prior to the removal of any contaminated waste from the site.

I Contractor shall field verify all work to be performed and all site conditions.

Contractor shall acquire and pay for all required local permits.

Contractor is responsible for distribution of water and electric as required for the successful completion of the abatement project and for the Owner's air monitoring requirements as directed by the Consultant.

Contractor shall provide Material Safety Data Sheets for all material to be utilized at the pre- construction meeting. Consultant expressly reserves the right to require material substitutions as they deem necessary.

Contractors employees shall be required to sign in and out on a daily basis at site security location to be determined.

Contractors project manager shall provide a daily work schedule clearly illustrating the progress of the work on a daily basis at the pre-construction meeting.

Contractor shall be held responsible for any damages to existing facility systems to remain.

S-11

NYC-WTC 000098590

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000098590Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →