Contract specifications for decontamination, 53 Park Place, Nov 2001

Machine-extracted title · confidence 90%

Contract specifications outlining site decontamination and asbestos disposal procedures for 53 Park Place.

NYC-WTC_000098577–000098611

Folder label: “32 PARK PLACE Block: 126 Lot: 2 Soe 7 BIN: 1001410 110 Church Street, 50 Murray Street

Page image
Scanned page image, NYC-WTC_000098591
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

All requests for clarification or extensions shall be in written form and be received by the Consultant in a timely manner.

DAMAGE TO PROPERTY

The Contractor shall restore to it's original condition, without cost to the Owner, any property I that becomes damaged due to negligence and/or work of the Contractor's employees, Sub- contractors or Sub-subcontractors. All such repairs must receive final approval of the Owner. Contractors project manager shall attend meetings at the project site as required by the I Consultant.

GENERAL

The Contractor shall be responsible for verifying the Contract Documents and the decontamination of all surfaces and disposal of all asbestos contaminated waste, under applicable regulations, is part of the work.

I There will be no increases in the contract value due to any misunderstanding of work to be done or materials to be used. The Contractor shall field verify all quantities and locations of contamination and all field conditions affecting the work. Any discrepancies between the Contract Documents and the field conditions shall be reported to the Consultant, in writing prior to the project start date.

The Contractor shall base his bid on his own inspection of quantities of work to be performed and evaluation of the conditions affecting the work. The Contract Documents are to be used as a guide and do not limit the Contractor's responsibility to seek and remove all asbestos containing dust, without limitation.

I SCHEDULE OF WORK

The schedule of removal work shall be coordinated with the Owner and Consultant as well I as conform with the requirements of the Contract Documents. The Contractor is advised that

"TIME IS OF THE ESSENCE IN THE PROSECUTION OF THE WORK"

Final air monitoring tests will commence following the completion of cleaning in each particular removal zone. The Contractor must maintain properly manned clean-up crews during the testing operations to allow for additional clean-up procedures if air tests should indicate fiber counts above required maximum level. Contractor must continue recleaning work at no additional cost to the Owner until acceptable air quality levels are obtained and the facility can be I occupied as scheduled.

H S-12

NYC-WTC 000098591

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000098591Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →