NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.2
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 111 pages

NYC-WTC_000233286

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000233286–000233396
Page image
Scanned page image, NYC-WTC_000233291
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

(a) owner-occupied single family dwellings, where the owner performs the work.

(b) the manufacture of asbestos or asbestos material, or to manufacturing processes involving the use of asbestos or asbestos material.

56-1.4 Responsibility of General Contractor or Construction Manager. All general contractors or construction management firms performing a supervisory role on a demolition, renovation, remodeling or repair project, that includes work covered by this Part, shall be deemed to exercise general supervisory authority over the work covered by this Part. As supervisor of the entire project, the general contractor or construction manager shall ascertain whether the asbestos contractor is in compliance with this Part, and shall require such asbestos contractor to come into compliance with this Part when necessary.

(a) All general contractors and construction managers on a demolition, renovation, remodeling, or repair project, which includes work covered by this Part, shall inform all trades on the work site about PACM, ACM and asbestos material (known and assumed) at the work site, and shall prohibit its disturbance by any trade other than the asbestos contractor.

56-1.5 Responsibility for Cleanup of Uncontrolled Disturbance. If there is an incidental disturbance or intentional disturbance (not as part of a controlled asbestos project) of ACM, PACM, asbestos material, or suspect miscellaneous ACM assumed to be ACM at a building or structure, upon discovery of the disturbance the property owner shall be responsible for contracting with a licensed asbestos contractor for immediate isolation of the disturbance and cleanup in accordance with all provisions of this Part.

56-1.6 Other Codes. All other Codes shall apply, including but not limited to. “The New York State Uniform Fire Prevention and Building Code” or its successor.

12 NYCRR56 Subpart 1, Page 5

CITY_21MC100_0 03235025

NYC-WTC_000233291

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000233291Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000127792 · Box DEP Box 52

NYC DEP Asbestos Project Notification form for abatement activities at a facility in the Phase 1 Decontamination Plan binder.

Similar indexed content

Compare copies and versions →