Asbestos Air Monitoring Results 100 Trinity Place, Oct-Nov 2001

Machine-extracted title · confidence 95%

A DEP results table showing daily asbestos air monitoring data at 100 Trinity Place from October to November 2001.

NYC-WTC_000132519–000132547
Page image
Scanned page image, NYC-WTC_000132523
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document 10/28/200115:55 ' § IibZ41D* mnnwac nra1cQ AAJ.Viv

be 13, The cleaned items will be stored in their existing offices. Each office willthese sealed until test results are lmown. A random air test will be collected in individual offices. by HEPA 14. MARCOR will clean all of the hardware surfaces in the offices vacuuming and wet-wiping the surfaces. Careful aucution will be given to replacing the rags used in the wep-wipe process. The interior of the desk drawers and cabinets will be opened and cleaned as well. Any papers or files will be disguarded as asbestos waste, assuming all paper goods that needed to be saved were removed during phase I 'abatement This housekeeping method will provide a mechanism to ensure the removal of any dispersed asbestos fibers.

15. Once all of the interior office furniture, cabinets, and other articles have been cleaned, tested, and sealed in each individual office, the airlock to the individual offices will be sealed. Everything in the office that was cleaned shall remain in the sealed offices until the building surfaces in the outer office are cleaned.

16. The office will be cleaned by HEPA vacuuming and we-wiping nonporous surfaces. The Acoustical ceiling tiles will remain in place, they will be HEPA vacuumed and the grid will be wet-wiped (ceiling will not be breached for any reason). The carpet in the entire space will be removed and double bagged and disguarded as asbestos waste.

17. The perimeter offices will be cleaned first and the work will progress toward the interior spaces. Once the entire office has been cleaned, a third party will visually inspect the entire office space, to ensure that no visible debris will be found.

18. Aggressive air monitoring will be perfonned throughout the office spaces. Test results will meet the AHERA clearance criteria. If the test results are within normal limits, the offices can be unsealed.

19. A barrier will be established in front of the cleaning chamber. The last decontamination chamber will be used as the airlock to enter the containment, remove the plastic sheeting, and decontaminate the remaining portion of the office. The containment area will be placed under negative air pressure during the process of removing the plastic sheeting, wood framing from the temporary walls, and cleaning this area of the office.

20. Again, final aggressive air monitoring will be performed before removing the last barrier and airlock in the office. The test results will meet the AHERA criteria of less than 70 structures of asbestos fibers per cubic centimeter of air.

NYC-WTC 000132523

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000132523Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →