NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 03/2002 E-Mail Sent M. Gilsenan
Document / 22 pages

2002 E-Mail Sent M. Gilsenan

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000139460–000139481
Page image
Scanned page image, NYC-WTC_000139465
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

vacuumed. Exhaust fans will be vacuumed and wiped. o. Closet interiors will be vacuumed. P- Solid objects (electrical equipment, exercise equipment, etc.) will be wet wiped, moved to allow cleaning of the underlying surface and will be returned to its original location. q- Dishwashers toe plates will be removed and the floor beneath the appliance will be cleaned. r. Protective covers on finned radiant heaters and baseboard heaters will be removed to expose heat elements. Fins are to be brushed and vacuumed to remove dust. s. All cleaning equipment will be vacuumed and/or washed for use on the residence.

3. HEPA air filtration devices (AFDs) will run continuously during all cleaning activities. A minimum of one air change every 30-minutes shall be provided.

4. At least one asbestos supervisor shall be present at each work place (work place is defined in Title 14, Chapter 1 RCNY as the work area and the decontamination enclosure system).

5. A cleaning checklist (to be developed) will be completed by the supervisor at the completion of the cleaning.

6. A thorough visual inspection will be conducted by the Proj ect Monitor to verify the absence of visible dust accumulations. Additional clean-up procedures shall be performed where visible dust is observed.

7. Air sampling shall be performed by the Monitoring Contractor after the area is fi-ee of dust accumulations as determined by the Project Monitor. Ifthe apartment does not meet the cleanup criteria of 0.0009 fibers/cc(TEM), the apartment will be recleaned at no additional cost and retested. [ needs additional analytical language]

8. Any damage or loss to that occurs during cleaning is the responsibility ofthe cleaning contractor. The cleaning contractor is not responsible for damage or loss caused by the acts ofparties not involved in the cleanup.

9. All waste generated shall be treated as asbestos containing material and shall be transported and disposed ofin compliance with Title 15,Chapter 1 ofthe Rules oftheCityofNew York andNew York Industrial Code Rule 56. Transportation and disposal of generated waste shall be in compliance with all applicable rules and regulations.

4

NYC-WTC_000139465

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000139465Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →