NYC 9/11 Public Portal Document
AUG 2t. "79 lb! 5 3 FP, ArEHSSwDOP CCNSTP. CC212 SA? T3 uG33o40 p.as-'Ob
AMSASSACOR CONSTRUCTION CO, INC
♦Mr. Waiter Weems
August 26, 1998
Page 4
3. Patch twenty two (22) existing columns; wall runs in front o*
column 3,500.00
4. Add 24|f of Hunicane wall as shown on D13 \ -r
13,900.00 9
I-
5. Add layer sheetrock of 200lf to Hurricane wall. 4,300.00 ^4;,
6 Deletion of top of wall. (14,000.00)
7, Additional work to furnish material and labor for tf?e steel
reinforcement fctr Blast proof access doors (19)'^nd Blast
proof doors (7jf 201 pieces of steel >4 plate 8^8^ 10,935.00 9
8. Remove existing column fronts (19), for new location of
Hurricane wall. 2,500.00
9. Leak detection system (additional to budget). 11,975.00 9
10. Electrical work on Hurricane dampers in ductwork((22>to
be connected to the new AS CO #917 from panel ELP-23B1,
Furnish and install override switch in watch commander's
station desk with indicator light to be operated manually.
Dampers not tied into fire alarm system. 21,800.00
11 Additional steel 3 'x3' x 5/16" steel angle welded to
spandrel as shown on D13. 16,765.00
12, Additional work on Hurricane damper duct to duct
refabricating and install new duct four (4) locations. 9,593.00
13. Additional work cn Hurricane dampers and fire smoke dampers
(15) locations of refabricating and installing new duct. 36.973.00 ?
14. Five (5) locations of Hurncane dampers with flexible connections,
additional ductwork as required, ' ,• 8,875.00
15. Hurricane damper ductwork with grill, af((32)ilocations. 31,537 00 nY’i r '
16. Hurricane damper ductwork at; (32) locations above wall. 66,308.00 .
- ’ Y'
Forward..
NYC-WTC_000173456
OCR can misread numbers and units. Confirm readings against the page image before using them.