Revised change order #4 submission, Sept 1 1998

Machine-extracted title · confidence 95%

Letter submitting revised change order #4 for concrete work and panel installation.

NYC-WTC_000172098–000172102

Folder label: “Mayor's Office of Emergency Management 7 World Trade Center - 1, 7 & 23rd Floors Change Order #004 REVISED Amb. Job # S57-5175

Page image
Scanned page image, NYC-WTC_000172101
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

AMBASSADOR CONSTRUCTION CO, INC.

Mr. Walter Weems September 1, 1998

Page Four...

3. Add 24lf of hurricane partition thru columns. $13,900.00 7o00

4. Add layer sheetrock of 200lf to Hurricane wall as shown on Sections 6 and 12 on D-13. $4,300.00 4"^^^

5. Deletion of top of wall. <$14,000.00> < JiS * 6. Additional work to furnish material and labor for the steel reinforcement for Blast proof access doors (19) and Blast proof doors (7). 201 pieces of steel 14 plate 8"x8" and wood blocking as per FSK-11. $14,835.00 ---- 137 7. Remove existing column fronts (19), for new location of I ^,7.^0 Hurricane wall. $2,500.00 _ |75( 8. Leak detection system (additional to budget). $11,975.00 -7O- ’•n t ■4-’7; 9. Electrical work on Hurricane dampers in ductwork (22) to be connected to the new ASCO #917 from panel ELP-23B1, . Furnish and install override switch in watch commander's station desk with indicator light to be operated manually. Dampers not tied into fire alarm system. $21,800. OCP / 1760, 10. Additional steel 3"x3" x 5/16" steel angle welded to spandrel as shown on DI3. $16,765.00

11. Additional work on Hurricane damper duct to duct refabricating and install new duct four (4) locations. $8,644.00 -

12. Additional work on Hurricane dampers and fire smoke dampers (15) locations of refabricating and installing new duct. $32,415.00 -.25^ 0°^ 13. Five (5) locations of Hurricane dampers with flexible connections, additional ductwork as required. $7,689.00 - fo,'too 14. Hurricane damper ductwork with grill, at (32) locations. $27,743.00

15. Hurricane damper ductwork at (32) locations above wall. $61,565.00

Forward...

NYC-WTC_000172101

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000172101Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Revised Change Order #004 for OEM, September 1998 · Box 7DCAS

NYC-WTC_000173810

Letter from Ambassador Construction submitting revised Change Order #004 for oil tank cradle and housekeeping pad work at the Mayor's Office of Emergency Management.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.999

machine-extracted · confidence unavailable · Check page ↗
Revised Change Order #004, 7 WTC, Sep 1998 · Box 7DCAS

NYC-WTC_000172050

Revised Change Order #004 submitted by Ambassador Construction Co. Inc. for $294,338 regarding work at the Mayor's Office of Emergency Management dated September 11, 1998.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.982

machine-extracted · confidence unavailable · Check page ↗
Revised Change Order #004, Sept 1998 · Box 7DCAS

NYC-WTC_000173309

Letter from Ambassador Construction submitting a revised change order for work at 7 World Trade Center.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.973

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000168684 · Box 7DCAS

Memo submitting revised Change Order #4 for oil tank and annunciator panel work at the Mayor's Office of Emergency Management in 7 World Trade Center.

Similar indexed content

NYC-WTC_000173810 · Box 7DCAS

Letter from Ambassador Construction submitting revised Change Order #004 for oil tank cradle and housekeeping pad work at the Mayor's Office of Emergency Management.

Similar indexed content

NYC-WTC_000173445 · Box 7DCAS

Ambassador Construction submits revised change order for electrical and concrete work at 7 World Trade Center.

Similar indexed content

NYC-WTC_000172050 · Box 7DCAS

Revised Change Order #004 submitted by Ambassador Construction Co. Inc. for $294,338 regarding work at the Mayor's Office of Emergency Management dated September 11, 1998.

Similar indexed content

NYC-WTC_000173453 · Box 7DCAS

Letter from Ambassador Construction submitting Change Order #004 for concrete and electrical work at 7 World Trade Center.

Similar indexed content

Compare copies and versions →