Change order #004 systems installation, 7 WTC, Aug 1998

Machine-extracted title · confidence 85%

Change order #004 for $261,029 covering oil tank removal, concrete housekeeping pad, and electrical systems installation.

NYC-WTC_000172028–000172032

Folder label: “Mayors Office of Emergency Management 7 World Trade Center - 1, 7 & 23rd Floors Change Order #004 Amb. Job # S57-5175

Page image
Scanned page image, NYC-WTC_000172031
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

** '34'3 r.OT'Ob

AMSASSAcoa construction co. inc

Mr. Walter Weems August 26, 1998

Page 4

3. Patch twenty two (22) existing columns; wall runs in front o< ' column 3,50C.00

4. Add 24|f of Hurricane wall as shown on DI3 ' 13,900,00 ^/(3OOu^

5. Add layer sheetrock of 200lf to Hurricane wall. 4,300.00 I ! 6. Deletion of top of wall. (14,000.00) X

7. Additional work to furnish material and labor for the steel reinforcement for Blast proof access doors (19) and Blast proof doors (7). 201 pieces of stee! !4 plate 8"x8”. 10,635.00- 13/75 8. Remove existing column frontsjl^ for new location of 4' . .

Hurricane wall. y J 2.500.00 i /

9. Leak detection system (additional to budget), u j J 11,975.00

10. Electrical work on Hurricane dampers In ductwork (22) to be connected to the new ASCO #917 from panel ELP-23B1, Furnish and install override switch in watch commander’s station desk with indicator light to ioe operated manually. Dampers not tied into fire alarm system. 21,800.00

11 Additional steel 3 X3' x 5/16" steel angle welded to spandrel as shown on D13. 16,765.00 JU so.. 12. Additional work on Hurricane damper duct to duct refabricating and install new duct four (4) locations. 9,593.00

13. Additional work on Hurricane dampers and rlre smoke dampers (15) locations of refabricating and. installing new duct. 36,973.00

14. Five (5) locations of Humcane dampers with flexible connections, additional ductwork as required. 8.875.00

15. Hurricane damper ductwork with grill, at (32) locations. 31.537 00

IS. Hurricane damper ductwork at (32) locations above wall. 66,308.00 I

Forward.

NYC-WTC_000172031

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000172031Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Revised Change Order #004 for OEM, September 1998 · Box 7DCAS

NYC-WTC_000173810

Letter from Ambassador Construction submitting revised Change Order #004 for oil tank cradle and housekeeping pad work at the Mayor's Office of Emergency Management.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.976

machine-extracted · confidence unavailable · Check page ↗
Revised Change Order #004, 7 WTC, Sep 1998 · Box 7DCAS

NYC-WTC_000172050

Revised Change Order #004 submitted by Ambassador Construction Co. Inc. for $294,338 regarding work at the Mayor's Office of Emergency Management dated September 11, 1998.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.964

machine-extracted · confidence unavailable · Check page ↗
Revised Change Order #004, Sept 1998 · Box 7DCAS

NYC-WTC_000173309

Letter from Ambassador Construction submitting a revised change order for work at 7 World Trade Center.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.963

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000173453 · Box 7DCAS

Letter from Ambassador Construction submitting Change Order #004 for concrete and electrical work at 7 World Trade Center.

Similar indexed content

NYC-WTC_000173445 · Box 7DCAS

Ambassador Construction submits revised change order for electrical and concrete work at 7 World Trade Center.

Similar indexed content

NYC-WTC_000173810 · Box 7DCAS

Letter from Ambassador Construction submitting revised Change Order #004 for oil tank cradle and housekeeping pad work at the Mayor's Office of Emergency Management.

Similar indexed content