NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/Door Schedule
Document / 16 pages

Door schedule specifications, Office of Emergency Management, 1998

Machine-extracted title · confidence 95%

Architectural specification sheet detailing door models, dimensions, fire ratings, and security features for the OEM facility.

NYC-WTC_000173374–000173389

Folder label: “Door Schedule

Page image
Scanned page image, NYC-WTC_000173387
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

MAYOR’S OFFICE OF EMERGENCY MANAGEMENT

SUPPLEMENT TO THE HVAC SPECIFICATION

SECTION 15120

1. Paragraph 1.1.A.5 - Delete “and the discharge plenum at the emergency generators.”

Add the following;

Discharge plenum at the emergency generators shall be double wall construction 4" thick, built of 16 GA galvanizes sheet metal with high temperature block insulation.

Plenum shall be built as per SMACNA standards for 2" w.g. pressure classification. All joints, seams, connections and abutments to the building structure shall be sealed with suitable pressure and temperature compounds and gaskets.

Pipe penetrations shall be sealed to prevent air leakage and condensation movement through the seal. Inner sheet shall be of G90 coated galvanized steel with welded connections. All weld on casing interior shall be painted.

Plenum shall be constructed to withstand 133% of the rated pressure without structure failure. Wall and roof deflections at the rated pressure shall not exceed 1/8" per foot.

High temperature block insulation shall be 11 lbs. Per cu. ft. Density molded hydrous calcium silicate with a maximum K factor of 0.42 at 200 degrees F mean temperature.

Insulation shall be securely wired in place with copper clad wire or galvanized steel bands ('/2" x .015) on 12" centers.

All joints and voids of insulation shall be filled and pointed with mineral wool cement.

SECTION 15150

1. Add paragraph 1.1 .M

Dampers shown on drawings designated as “F/SM” shall comply with the following:

Dampers shall be pneumatically operated combination fire and smoke Ruskin, Imperial, or approved equal. They shall be provided with factory installed U.L. rated full sleeves. Provide air foil or “V” Blade damper blades supported with shafts and stainless steel bearings to allow daily operation. Provide intermediate supports for damper blades more than 36" long. They shall conform to UL Standard 555S as leakage rated dampers in smoke control systems and when closed shall be the equivalent of a 1-1/2 hour fire damper. Leakage shall conform to Class 2 withjnaximum leakage of lOCFM/Sq. Ft. at

NYC-WTC_000173387

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000173387Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

RFI log cover sheet, Sep 1998 · Box 7DCAS

NYC-WTC_000166743

Cover sheet for the Request for Information log documenting 37 received RFI items for the 7 World Trade Center project as of September 16, 1998.

2 shared non-person entities · Same agency, volume and box · similarity 0.943

machine-extracted · confidence unavailable · Check page ↗
Security system specification excerpt, May 1998 · Box 7DCAS

NYC-WTC_000173219

Technical specification document detailing end-of-line resistor wiring requirements for the Mayor's Office of Emergency Management security system.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.932

machine-extracted · confidence unavailable · Check page ↗
Addendum #1 to specifications, May 1998 · Box 7DCAS

NYC-WTC_000173205

Transmittal letter for Addendum #1 modifying project specifications and drawings for the Mayor's Office of Emergency Management at 7 World Trade Center.

2 shared non-person entities · Same agency, volume and box · similarity 0.929

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

RFI log cover sheet, Sep 1998 · Box 7DCAS

NYC-WTC_000166743

Cover sheet for the Request for Information log documenting 37 received RFI items for the 7 World Trade Center project as of September 16, 1998.

Similar indexed content

Compare copies and versions →